My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0108_AABG_2025-MAY
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-108
>
29C0108_AABG_2025-MAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 3:07:45 PM
Creation date
7/2/2025 3:05:36 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-108
Type - Bridge Supporting Doc
Inspection
Name
Middle River - Bacon Island Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rtment of Transportation - Division of Maintenance Structure Maintenance & I <br />DECK WORK RECOMMENDATIONS <br />Rec Date 02/24/1999 Work By LOCAL AGENCY Est Cost Dist Target <br />Status PROPOSED Action Deck -Patch spalls Str Target ROUTINE EA <br />Repair the spalled deck joint at Bent 6. <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS - NONE <br />SUPERSTRUCTURE WORK RECOMMENDATIONS - NONE <br />SUBSTRUCTURE WORK RECOMMENDATIONS - NONE <br />MECHANICAL/ELECTRICAL WORK RECOMMENDATIONS <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad <br />Str Target <br />ROUTINE <br />EA <br />The west PA speaker is not working check the wiring to the speaker, and <br />replace it if necessary. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target <br />ROUTINE <br />EA <br />The GFCI receptacle at the East pier is not working and needs to be replaced. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target <br />ROUTINE <br />EA <br />The submarine cable junction box at the center pier is missing the junction box lid hinge. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Rehab/Upg <br />Str Target <br />ROUTINE <br />EA <br />The West traffic signal sign light cover is broken. Replace. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Mist <br />Str Target <br />ROUTINE <br />EA <br />There is no dielectric mat in the bridge house in front of the motor control <br />center. Install a mat. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target <br />ROUTINE <br />EA <br />The Northeast advance warning sign light is missing a light bulb. <br />Rec Date 05/12/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target <br />ROUTINE <br />EA <br />Replace the burned out pilot lights on the control desk. <br />Rec Date 05/08/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad <br />Str Target <br />ROUTINE <br />EA <br />Lubrication: <br />Drain the center bearing oil and refill it to the correct level. Note the date on the bearing when the oil was replaced. <br />Rec Date 05/08/2023 Work By LOCAL AGENCY Est Cost Dist Target <br />Status PROPOSED Action Mech/Elect-Replace Str Target ROUTINE EA <br />Replace the missing light covers in and around the control house. <br />Replace burned out navigation and traffic control lights. <br />OTHER WORK RECOMMENDATIONS <br />Printed on: Monday 06/23/2025 03:39 PM Page 9 of 9 29C0108/AABG/154008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.