rtment of Transportation - Division of Maintenance <br />Structure Maintenance & I <br />DECK WORK RECOMMENDATIONS <br />Rec Date 09/19/2007 Work By LOCAL AGENCY Est Cost Dist Target <br />Status PROPOSED Action Deck -Rehab Str Target ROUTINE EA <br />Due to the overall condition of the deck on this structure, the County should rehabilitate deck or replace the deck. <br />JOINT/APPR/RAIL WORK RECOMMENDATIONS <br />Rec Date 01/14/2020 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Rail -Mist <br />Str Target ROUTINE <br />EA <br />Paint the steel railings. <br />SUPERSTRUCTURE WORK RECOMMENDATIONS <br />Rec Date 01/13/2005 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Super -Mist <br />Str Target ROUTINE <br />EA <br />Repair the heavily damaged lower struts of the sway frames. <br />SUBSTRUCTURE WORK RECOMMENDATIONS -NONE <br />MECHANICAL/ELECTRICAL WORK RECOMMENDATIONS <br />Rec Date 05/13/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Clean <br />Str Target ROUTINE <br />EA <br />The northeast corner of the swing span is hitting brush on the shore during <br />openings. Remove the brush so the span swings free of <br />obstructions. <br />Rec Date 05/13/2025 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Rehab/Upg <br />Str Target ROUTINE <br />EA <br />The insulation resistance reading for the center wedge motor is low. Check <br />insulation resistance periodically <br />and if the readings do not <br />improve (>10 Megohms), pull the motor for rewinding or replacement. <br />Rec Date 05/09/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target PRIORITY <br />EA <br />Both North and South gates have exceeded their operational life and need be replaced with new gates with hard wired power supply. <br />Both gates have exposed wiring and degraded wiring insultaion. Both gates have faulty motor contactors. <br />Rec Date 05/09/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Repair/Ad <br />Str Target ROUTINE <br />EA <br />All of the end wedge drive chains are too loose and need to be adjusted to take out slack. <br />Rec Date 05/09/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Rehab/Upg <br />Str Target ROUTINE <br />EA <br />All electrical panels need proper labeling and arc flash notices installed according to NEC requirements. <br />Rec Date 05/09/2023 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Mech/Elect-Replace <br />Str Target ROUTINE <br />EA <br />Replace all burned out navigation lamps. <br />OTHER WORK RECOMMENDATIONS <br />Rec Date 01/10/2022 Work By LOCAL AGENCY <br />Est Cost <br />Dist Target <br />Status PROPOSED Action Paint Bridge Superst <br />Str Target ROUTINE <br />EA <br />Paint the truss, stringers and floor beams. <br />Printed on: Monday 06/23/2025 03:35 PM Page 8 of 8 29C0131/AABI/153160 <br />