My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
29C0441_AAAH_2024-DEC
PublicWorks
>
ArcGIS Online
>
Bridges
>
29C-441
>
29C0441_AAAH_2024-DEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 3:36:34 PM
Creation date
7/2/2025 3:36:05 PM
Metadata
Fields
Template:
Supporting Docs - Bridge
Bridge #
29C-441
Type - Bridge Supporting Doc
Inspection
Name
Tom Paine Slough - El Rancho Road
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Department of Transportation - Division of Maintenance <br />Structure Maintenance & Investigations <br />INSPECTION COMMENTARY <br />SCOPE AND ACCESS <br />All elements listed in the "Underwater Elements Investigated" section of the report were inspected from the waterline down to the <br />mudline. The inspection of the remainder of the element and all other elements is the responsibility of the routine inspection. <br />This structure was inspected using wade and probe equipment and techniques. Inspecting operations were staged from shore and <br />inspector access was from the northeast bank. <br />This underwater inspection follows the procedures of Section 5.4 of the SM&I Procedures Manual. <br />SUBSTRUCTURE <br />All submerged elements were covered with a thin layer of growth which could easily be removed by the diver's gloved hands. This <br />condition allowed for a 100% Level I inspection and a minimum of 10% Level II inspection of the submerged portions of the elements. <br />Prior to this inspection the SNBI B.C.15 Underwater Inspection rating was 7. The conditions present on the date of this inspection are <br />consistent with a SNBI rating of 8. <br />For reference purposes, the height from waterline to the top of rail was 13 feet 8 inches at Bent 3, Column 5 at 1046 hours on the day of <br />this inspection. <br />The following depths and/or miscellaneous conditions were noted: <br />Pier 2: <br />Column 1 Mudline - 2.0 feet <br />Column 5 Mudline - 2.5 feet <br />Pier 3: <br />Column 1 Mudline - 2.0 feet <br />Column 5 Mudline - 2.0 feet <br />Element 204, Column - PS Conc. <br />See ELI table for condition state and rating. <br />WATERWAY <br />Prior to this inspection the SNBI B.C.09 Channel was coded 6. The conditions present on the date of this inspection are consistent with a <br />SNBI rating of 6. <br />Prior to this inspection the SNBI B.C.10 Channel Protection rating was not populated. The conditions present on the date of this <br />inspection are consistent with a SNBI rating of N. <br />Prior to this inspection the SNBI B.C.11 Scour condition rating was 7. The conditions present on the date of this inspection are consistent <br />with a SNBI rating of 8. <br />Prior to this inspection the SNBI B.AP.03 Scour Vulnerability rating was directly transitioned from the NBI Item 113 Scour Critical Bridge <br />Rating and was assigned temporary rating of (AB-T). The conditions present on the date of this inspection are consistent with a SNBI <br />rating of (AB-T). <br />STEEL INVESTIGATION DETAILS - NOT APPLICABLE FOR THIS BRIDGE. <br />UNDERWATER INVESTIGATION DETAILS <br />UWI Required Y Last UWI 12/09/2024 <br />Dive Type B - Routine UW <br />Dive Mode A - Wade <br />Contractor N/A <br />Contract No. N/A <br />Supervisor <br />Tender <br />UNDERWATER ELEMENTS INVESTIGATED <br />Location Depth(ft) Vel(ft/s) Channel Material <br />Pier 2 2.0 0.0 Soft Mud <br />Pier 3 2.5 0.0 Soft Mud <br />Printed on: Monday 06/23/2025 02:12 PM <br />UWI Frequency 60 months <br />Water Type 1 - Fresh <br />Max. Water Velocity <br />Max. Water Depth <br />Max. Visibility <br />Water Surface Elev. <br />Diver <br />Backup Diver <br />Next UWI 12/09/2029 <br />Element Description <br />5 each - Element 204 - Column PS Concrete <br />5 each - Element 204 - Column PS Concrete <br />0 ft/s <br />2.5 ft <br />2.0 ft <br />ft <br />Michael grams <br />Mitch Miller <br />Page 3 of 5 <br />29C0441 /AAAH/148034 <br />
The URL can be used to link to this page
Your browser does not support the video tag.