My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502405
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502001 thru PW-ENCUTIL-2502500
>
PW-ENCUTIL-2502405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 9:21:37 AM
Creation date
7/3/2025 9:20:52 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502405
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
2031 E. Sixth St.
Type - Permit Process
PM 47168867 - PG&E to excavate 3' x 3' bell hole to repair broken anode wire and raise existing buried G5 box.
Address
3136 Boeing, Stockton, CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -3- <br />ENCROACHMENT PERMIT <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />24. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.