My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502406
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502001 thru PW-ENCUTIL-2502500
>
PW-ENCUTIL-2502406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 9:28:55 AM
Creation date
7/3/2025 9:24:43 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502406
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
S/S of Eleventh St. Approx. 260' W/O Chrisman Rd.
Type - Permit Process
PM 47052477 - Excavate 4' x 4' bell hole to repair gas leak. Pre/Post CCTV may take place. Restoration to follow.
Address
3136 Boeing, Stockton,CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -3- <br />ENCROACHMENT PERMIT <br />23. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />24. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.