My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502423
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502001 thru PW-ENCUTIL-2502500
>
PW-ENCUTIL-2502423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 9:04:12 AM
Creation date
7/7/2025 9:03:17 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502423
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
South Side of W. Benjamin Holt Dr. Approximately 180' S/W of Alexandria Pl.; 6625 Alexandria Pl., 2224 W. Benjamin Holt Dr.
Type - Permit Process
TCP needed for shoulder closure to access XB PFP & BV #2204 on Alexandria Pl. and MH #804 on W. Benjamin Holt Dr.
Address
1445 Van Ness Ave., Fresno
Application
AT&T California
Project #
730079
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />and/or adjustment of these facilities as determined by the County at AT&T's expense. (Streets <br />and Highways Code Section 1463) <br />12. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />13. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />14. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />15. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.