My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502456
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502001 thru PW-ENCUTIL-2502500
>
PW-ENCUTIL-2502456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 12:17:45 PM
Creation date
7/7/2025 12:17:17 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502456
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
North side of Norman Ave., West of N. Sibley Ave. in Stockton
Type - Permit Process
Excavate 5x5 bell hole to cut off gas service
Address
3136 Boeing, Stockton,CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6" Min <br />(TYP) <br />3' - O" <br />Vlar <br />1 <br />OD/2 <br />See Note 1 Below <br />-Existing- <br />Pavement <br />��I�� <br />\/ <br />See Note <br />2 Below <br />\/I <br />Compact in <br />12" max <br />layers to a <br />min relative <br />compaction of 95% <br />under pavement <br />- - - - -_ <br />90% o <br />Compact in <br />pavement. <br />24" max <br />layers to a min relatN <br />compaction of 85%. <br />-Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />10" Min — --a-ODi �10" Min <br />OD <br />s+ 20" Min <br />RIGID CONDUIT <br />NOTES: <br />�6" Min <br />V�) (TYP) <br />3'� 0" <br />i <br />Var <br />OD+ 12" <br />1 <br />10" Min i ----*-ODi f10" Min <br />s OD <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1 " thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Wirking for YOU <br />Approved by: <br />TYPICAL TRENCH BACKFILL `��WMg2e� <br />No. Revision Description Date <br />I <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />I Date: DEC 2014 Std. Dwg. No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.