My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2502455
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2502001 thru PW-ENCUTIL-2502500
>
PW-ENCUTIL-2502455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 12:22:19 PM
Creation date
7/7/2025 12:20:30 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2502455
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
East side of N. Oro Ave., South of E. Fremont St. in Stockton
Type - Permit Process
Traffic control to perform tie ins for new UG service. (Applicant trench)
Address
3136 Boeing, Stockton,CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONCRETE CURB, GUTTER AND SIDEWALK CONSTRUCTION NOTES <br />1. Curb, gutter and sidewalk construction shall conform to Section 73, <br />Standard Specifications, California Department of Transportation (Caltrans), <br />except as modified herein. <br />2. Reference is made to the local agencies Standard Specifications for additional <br />requirements relating to the construction of concrete curb, gutter and sidewalk. <br />3. Subgrade for Curb, gutter and sidewalk and Driveways shall be compacted to <br />a minimum relative compaction of 90% to a depth of 6". Where the subgrade <br />"R" value is less than 30, place 4" minimum of aggregate subbase class IV <br />under the concrete sections and compacted to a minimum of 95%. <br />4. All radii for rounding edges shall be 3/4" unless otherwise noted. <br />5. Portland cement concrete shall be Class 3, per Caltrans Section 90, <br />Standard Specifications, California Department of Transportation (Caltrans), <br />except as modified herein. <br />6. Expansion joints and weakened plane joint shall be placed as indicated elsewhere <br />in the Construction Standards. Expansion joint spacing shall not exceed 80'. <br />7. Curb, gutter and sidewalk shall have a light broom finish. curb and gutter; <br />parallel to the flow line, Sidewalks; perpendicular to the flowline. <br />8. Depress a 2" high letter "W" or "S", 1 1 /4" deep into the top of the curb <br />to identify service locations. <br />9. During construction of gutters, water shall be used to ensure proper drainage <br />along the flowline. <br />10. Access curb ramps, sidewalks and improvements in the ADA path of travel shall <br />be constructed in conformance with the Federal Americans with Disabilities Act, <br />California Title 24, and these Standards. <br />Wording for YOU <br />CONCRETE CURB, GUTTER Approved by: <br />AND SIDEWALK `�Wm W, - P-,/ <br />CONSTRUCTION STANDARDS INo. Revision Description Date <br />I <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />I Date: DEC 2014 IStd. Dwg. No. R-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.