My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2502167
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCROACH-2502001 thru PW-ENCROACH-2502500
>
PW-ENCROACH-2502167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 11:44:40 AM
Creation date
8/4/2025 11:43:28 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2502167
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
Intersection of Empire Tract Road and Eight Mile Road, also being the west end of Eight Mile Road.
Type - Permit Process
Road Closure - Empire Tract Road south of Eight Mile Road.
Address
2500 Navy Drive, Stockton,CA 95206
Application
City of Stockton
Project #
110005
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PW-ENCROACH-2502167 July 23, 2025 <br />REVISED <br />SPECIAL CONDITIONS FOR <br />CITY OF STOCKTON - EMPIRE TRACT RD <br />ENCROACHMENT PERMIT <br />1. ROAD CLOSURE PERMIT: Permittee/contractor MUST email County Field Engineering at <br />PWroadclosure(a)siaov.orq. a minimum of (2) business days prior to start of road closure with <br />location, date, duration, and emergency contact information (name and phone number). <br />2. Maintain traffic controls for all roads. Two-way traffic shall be maintained during non -working <br />hours with excavated areas backfilled or plated. <br />3. Empire Tract Road — Full road closure allowed from June 15, 2025 at 7:OOAM to August 29, 2025 <br />at 4:00 PM, closed 24/7. <br />4. Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven (7) days prior to the road closure. <br />5. Permittee/contractor MUST email County Field Engineering at PWroadclosure(C-)-siaov.ora, a <br />minimum of (2) business days prior to start of road closure with location, date, duration, and <br />emergency contact information (name and phone number). <br />6. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in -kind or better materials. <br />7. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />8. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />9. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />10. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />11. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />12. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.