Laserfiche WebLink
PW-ENCROACH-2502167 July 23, 2025 <br />REVISED <br />SPECIAL CONDITIONS FOR <br />CITY OF STOCKTON - EMPIRE TRACT RD <br />ENCROACHMENT PERMIT <br />1. ROAD CLOSURE PERMIT: Permittee/contractor MUST email County Field Engineering at <br />PWroadclosure(a)siaov.orq. a minimum of (2) business days prior to start of road closure with <br />location, date, duration, and emergency contact information (name and phone number). <br />2. Maintain traffic controls for all roads. Two-way traffic shall be maintained during non -working <br />hours with excavated areas backfilled or plated. <br />3. Empire Tract Road — Full road closure allowed from June 15, 2025 at 7:OOAM to August 29, 2025 <br />at 4:00 PM, closed 24/7. <br />4. Applicant shall notify and coordinate with all emergency services (fire, police, etc.), local schools <br />and the local postmaster a minimum of seven (7) days prior to the road closure. <br />5. Permittee/contractor MUST email County Field Engineering at PWroadclosure(C-)-siaov.ora, a <br />minimum of (2) business days prior to start of road closure with location, date, duration, and <br />emergency contact information (name and phone number). <br />6. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in -kind or better materials. <br />7. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br />advance of any impacts to their access. <br />8. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />9. All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />10. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />11. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />12. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />