My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2502591
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCROACH-2502501 thru PW-ENCROACH-2503000
>
PW-ENCROACH-2502591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 12:40:18 PM
Creation date
8/4/2025 12:39:24 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2502591
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
Sperry Road & Airport Way
Type - Permit Process
Traffic Control for a City Development Project
Address
2190 Meridian Park Blvd., Suite G, Concord, CA 94520
Application
Airport Petroleum, LLC
Project #
110005
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF STOCKTON <br />PUBLIC WORKS DEPARTMENT <br />www.stocktonca.gov • (209)937-8411 <br />IMPORTANT INFORMATION <br />1. Each Submittal is required to have its own Submittal Cover Sheet or it will be rejected. <br />2. Submittals will not be received prior to approved plans and completion of a preconstruction (Pre -Con) <br />meeting for the project. <br />Date: 5/27/2025 <br />Development Name / Unit: <br />Approved "C" Drawing Number: <br />ARCO AMPM Mini & Gas Station <br />5568C <br />(NOTE: This is the 4-digit number that was assigned by the City at the Pre -Con Meeting.) <br />Submittal Number: 1 <br />Submittal Description: Traffic Control <br />Specification Number Reference (for submittal): <br />Contact Person's Information (Submittals will be returned to this person) <br />Name: Martin Parra <br />E-Mail Address: martinp@rrpaccon.com <br />Phone: 530-383-8913 <br />Prime Contractor for Submittal: R&R Pacific Construction <br />Subcontractor for Submittal: <br />*Processing and review of submittals cannot commence until all information has been received. <br />
The URL can be used to link to this page
Your browser does not support the video tag.