My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2501052
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCROACH-2501001 thru PW-ENCROACH-2501500
>
PW-ENCROACH-2501052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 9:05:16 AM
Creation date
8/7/2025 9:04:30 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2501052
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
0.4 miles West of Murphy Road, Ripon,CA
Type - Permit Process
Bore (2)-10" CL160 PVC pipelines across the road
Address
12500 Bentley Street, Waterford, CA 95386
Application
Waterford Irrigation Supply, Inc.
Project #
110005
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PW-ENCROACH-2501052 <br />SPECIAL CONDITIONS FOR <br />MELLO AVENUE <br />ENCROACHMENT PERMIT <br />March 25, 2025 <br />Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes for local <br />traffic. Two-way traffic shall be maintained during non -working hours with excavated areas <br />backfilled or plated. During working hours, lane closure shall be used within the road closure to <br />regulate local traffic thru immediate work zone. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in -kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br />advance of any impacts to their access. <br />4. Emergency responder access to effected residences shall be maintained at all times. <br />5. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br />least 48 hours in advance of the work. <br />6. Existing fences shall not be removed without written consent signed by the property owner and <br />submitted to the County prior to the removal. Fences removed shall be restored with in -kind or <br />better materials at the edge of the right-of-way. <br />7. The Permittee shall be responsible for any and all costs associated with the removal, relocation <br />and/or adjustment of the private pipeline as determined by the County at the Permittee's <br />expense. (Streets and Highways Code Section 1463) <br />8. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />9. Pipeline shall be on a straight grade a minimum of 30" below ditches or toe of embankment slope. <br />10. Markers are to be set at the County right-of-way line (property line) on both sides of (MELLO <br />AVENUE) Identifying the location of the pipeline crossing and the name of the contact person. <br />11. The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />
The URL can be used to link to this page
Your browser does not support the video tag.