SIGN LEGEND
<br />GENERAL TRAFFIC CONTROL NOTES:
<br />DD C H p
<br />A EAD AHEAD IAHEADD j
<br />g
<br />BKE
<br />gHEAD I '•� C OSED C OSED AHEAD TO STOPD
<br />1. THE CONTRACTOR IS RESPONSIBLE FOR PROMPTLY RESTORING THE ROAD BACK TO SATISFACTORY CONDITION WHICH INCLUDES, BUT IS NOT
<br />LIMITED TO, PAYING, SRIPING MARKNGSIGNAGE, AND LOOP DETECTION ALL PLANS SHALL BE IN
<br />2' THE AGENCYRESERV STTHE RIGHT TOIOBSERVE THESE TRAFFIC CONTROL PLANS IN OPERATION AND OCMAKEE CHANGES AS FIELD CONDITIONS
<br />WARRANT.
<br />W20-1 W20-3 W20-2 C20(CA)(R) C20(CA)(L) W9-3
<br />C20(CA)(BIKE) W4-2(R) C30(CA) C30(BIKE) W20-4 W3-4
<br />WI-2(l)
<br />3 TRENCHES SHALL BE BACKFILLED OR STEEL -PLATED DURING NON -WORK HOURS STEEL PLATES SHALL HAVE AN ASPHALT RAMP ON ALL EDGES,
<br />RAMP
<br />O♦ NEW
<br />CLOSED ` a #
<br />OPEN
<br />O O
<br />SECURELY SUPPORTED SO THEY WON'T ROCK AND A SIGN POSTED NEAR THE PLATES IDENTIFYING THE CONTRACTOR'S NAME AND 24 HOUR
<br />EMERGENCY TELEPHONE NUMBER, ALL DIRT, DUST, AND DEBRIS SHALL BE REMOVED FROM THE STREET AT THE END OF EACH DAY AND AT
<br />THE END OF THE JOB. THE STREET SHALL BE KEPT IN A DRIVABLE CONDITION AT ALL TIMES.
<br />NAR OWS
<br />AHEAD
<br />TRENCH
<br />4 ANY WORK THAT CREATES AN UNDUE SAFETY RISK OR THAT CREATES SEVERE CONGESTION WILL BE SHUTDOWN BY THE AGENCY
<br />w20-3 W3-5 C12(CA) W5-1 W12-1 w6-3
<br />W1-4(L) W4-1 W21-1U C9A (CA) C27(CA) wit-1
<br />5 A COPY OF ALL TRAFFIC REQUIREMENTS AND TRAFFIC CONTROL PLANS ISSUED BY THE AGENCY MUST BE KEPT ON THE JOB SITE
<br />SHOULDER SHOULDER SHDI �LDpR SC�OSEDR
<br />WORK CLOSEO D OS fT O
<br />WI-4(R)
<br />�0� YIELO °®�
<br />®
<br />OVAL F THIS DOES NOT E AN CT THE AGENCY MIT
<br />6• ALLTRAVELOLANES WILL TYPICALLY BE A MINIMUM OF012 FEET WIDE, PERMIT4 FEETIFADJACENT O BIKE LANES,INFORMATIONUNL
<br />ESS ESS OTHERWISE PECIFICALLY
<br />APPROVED BY THE AGENCY.
<br />R® a® R®
<br />W21-5 W21-5bR W21-5b C30A
<br />R R�
<br />RI-1 R1-2 R5-1 SLOW PADDLE
<br />S. FLASHING ARROW BOARDS AS REQUIRED BY THE AGENCY.
<br />RIGHT UNE LEFT LANE ROAD CLOSED BEGIN
<br />ROAD RAMP
<br />CLOSED CLOSED 1HRUT1RNTIC RnEWTROPDP
<br />g(E BUSES KEEP KEEP
<br />� ONLY � '
<br />MUY
<br />F ®�� , I
<br />9. WARNING (W) SERIES SIGNS USED IN WORK ZONES SHALL BE BLACK ON AN ORANGE BACKGROUND.
<br />10. CONES AND PYLONS SHALL HAVE YELLOW REFLECTORIZED SLEEVES WHEN PLACED ALONG THE CENTERLINE AND WHITE REFLECTORIZED
<br />SLEEVES ALONG THE OUTSIDE SHOULDER.
<br />TURN RIGHT TURN RIGFD
<br />RI 1-2 R11-2 R11-4
<br />R3-7(R) R3-7(L)
<br />RIGH•f
<br />R4 11 SPCL R4-7G R4-80 R3-6((R)) R4-7 R4-8 R3-5R R60B CA
<br />R3-8(L)
<br />11 IF PARKING IS ALLOWED IN THE ADVANCE WORKING AREA, ADVANCE WARNING SIGNS SHALL BE MOUNTED ON HIGH LEVEL DEVICES
<br />SIDEWALK
<br />CLOSED ROAD
<br />MIMIM ®OW
<br />R9-9 R9-tt(L) R9-11a(L) G20-2
<br />DETOUR
<br />» ?DETOUR It
<br />END D�f=
<br />SC3 (CA) M4-Bo [it
<br />12, THE CONTRACTOR SHALL POST OW-AWAY/NO PARKING SIGNS SEVENTY-TWO (72) HOURS IN ADVANCE, WITH DAY OF WEEK, DATE, AND WORK
<br />HOURS NOTED, AND SHALL BAG PARKING METERS (WHERE APPLICABLE)
<br />R9-10 Wt-6(R)
<br />R9-11 R R9-11a R W1-6(L)
<br />Wl-7 MM4-1o(L)
<br />MM4-10(R) R13A R13B
<br />13. OPEN CUTWORK SHALL BE DONE IN _PHASES.
<br />DO NOT
<br />14. WORKERS SHALL WEAR HARD HATS AND ORANGE VESTS AT ALL TIMES,
<br />STOP
<br />ON
<br />11, COUNTY TRANSIT DISTRICT SHALL BE NOTIFIED (5) WORKING DAYS PRIOR TO ANY WORK THAT AFFECTS BUS STOPS.
<br />TRACKS
<br />16. CONSTRUCTION SIGNS SHALL NOT OBSTRUCT SIGHT VISIBILITY AT DRIVEWAYS.
<br />RB-B SYMBOL
<br />LEGEND
<br />17. CONTRACTOR SHALL NOTIFY ALL LOCAL BUSINESS OWNERS/OCCUPANTS 72 HOURS IN ADVANCE PRIOR TO ANY CONSTRUCTION ADJACENT TO
<br />BUSINESSES.
<br />JOB LOCATION WORK HOURS
<br />F 0 �
<br />F7W � FTW7 ® O
<br />FROM
<br />444 S DEL MAR AVE. TD E CE/co
<br />6
<br />-RECOMMENDED
<br />W/SI W/SI IG"LIZEDMENDS
<br />-TABLE 6G21114 G4LIFORNIA MUTCD- Tq CD
<br />ADVANCE WARNING SIGN EPACING-
<br />ADVAN EWARCALIFING SIGNMUTD- ac T rvro ar. m cRRBRorvmoizorvs
<br />I
<br />ROADttPE DISTANCE BETWEEN SIGNS" v[D sT'ry CE
<br />A E c D1
<br />3EGIN CROSS STREET END CROSS STREET t
<br />n• uasArv-11-P,
<br />WARNING DEVICE ARROWEOHRD STOPPINGD
<br />�MPN)"F FD
<br />RLrss 100 FEET l CEET I "� i09L
<br />* J
<br />W/SIGN(5HOC'W)
<br />WALKER LN. CARROLL AYE. 0
<br />W/SIGN(3Ho2'W) Iuaaa -
<br />0 0 0I B
<br />j.olEET
<br />• III FEET 50 FEET 211 FEET DD 116S 1{
<br />µunl
<br />x
<br />MMP 3'.FEEr soFEBsOFE11 D TABLE 6Cg,2.D.l4 soo FEEr oo FEEr so0 FEErEARRI—E
<br />HERMIT NUMBER THOMAS GUIDE
<br />To N
<br />EARRICADE STOPPING I E*.RBxw,,.iF,H. 1,00u FEET s0D FEET 2,64o FEET I �� o,p
<br />AHPN so 425
<br />AERIAL CABLE
<br />�N
<br />CMS
<br />EXI STE NG - MFslc PSi�N
<br />saucE EoxSTRIPING
<br />m„�mrvE,D.-.HI.oR s,D. s�R,D..s.P.,DeT
<br />"""""""""'"'"•'°"°•"••'",x`�"�'"�` Wx
<br />■��■
<br />,UNNG Arv, RAreo or.aanrv�:rffRlry
<br />F-0-1 ® F —01
<br />DrHT
<br />.. shame ox�xenxnrnn,Eoo Rs..Eo,...r :...R Irv.„,.,xrx rAreo ore.Anrv�
<br />SCOPE OF WORK TRENCHING
<br />POLE, AERIAL, MH & PFP PLACEMENT, SB
<br />ACCESS, BORING, POLE REMOVAL =
<br />�
<br />® 0 ® ®®
<br />C O U N TY NAME: SA N J OAQ U I N
<br />TRENCHING & MH ACCESS DRI WAY
<br />(ArnVIrvAREA) RAVELEIIIN RPING
<br />Flaws
<br />START DATE END DATE POSTED SPEED
<br />APPROACH TACONE SIGN
<br />SPACING SPACING
<br />TRAFFIC
<br />JOB NUMBER A02G1QS
<br />SCALE.
<br />CONTROL PLAN
<br />VARIES
<br />VARIES VARIES VARIES VARIES
<br />PAGE' 1 OF 21
<br />OF
<br />TRAFFIC CONTRO PLAN DISCLOSURE PLANS ACCEPTED BY
<br />3ERMITWORK EXTENSIONS MUST BE OBTAINED BY THE NOTHING CONTAINED ON THIS DRAWING SHALLPREVENTLOCALIURISDICTIONS FROM. QI I I�Oc� qpat&tMODIFYING, CHANGING, ORADOPTING NEW SPECIFICATIONS DEEMED NECESSARY 1 1 1
<br />END OF PERMIT DATE osTF
<br />CRITERIA FOR POSCDDN, LOCATION, AND USE OF TRAFFIC CONTROL DEVICES IS SOLELY FOR
<br />THE PURPOSE OF GUIDANCE TO ASSIST IN THE SET UP OF THE TRAFFIC CONTROL PLANS R.E C.
<br />. PLANS PREPARED BY ��no
<br />NAME AYUSHI UPADHYAY 0 o4a�
<br />APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN OFFICIAL PERMIT CONTACT THE AGENCY
<br />FOR INFORMATION ON OBTAINING A PERMIT
<br />FXP GATF DATE 8/7/24 ISSUE 0
<br />
|