My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2503098
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2025
>
PW-ENCUTIL-2503001 thru PW-ENCUTIL-2503500
>
PW-ENCUTIL-2503098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 9:33:34 AM
Creation date
8/13/2025 9:28:04 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2503098
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2025
Location
Milgeo Ave. and Murphy Rd. Intersection to A tower pole - utility poles.
Type - Permit Process
Set-up traffic control to access and work on existing utility poles. No underground work.
Address
4120 Citrus Ave., Rocklin, CA 95677
Application
Astound/Wave Broadband
Project #
110005
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />removal, relocation and/or adjustment of these facilities as determined by the County at <br />Astound's expense. (Streets and Highways Code Section 1463) <br />12. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />13. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />14. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />15. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.