Laserfiche WebLink
DRIVEWAY ENCROACHMENT PERMIT <br /> <br />E.P. No.: 95-063 <br />Date Issued: 3-30-95 <br />Expiration Date: 4-1-96 <br /> <br />To: Escalon Unified School District <br /> 1520 E. Yosemite Ave. <br /> Escalon,CA 95320 <br /> <br />Location: E/S Van Allen Rd. 1/4 Mi. <br /> N/O Hwy 120 <br /> <br />In compliance with your request of 3-22, 1995, and subject to all the terms, condi- <br />tions and restrictions written below or printed as general or special provisions on any part of this form. <br /> <br />Permission is hereby granted to construct one driveway approach as shown on <br />Permit Application No. 95-063-SE. <br /> <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br />hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br />the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> <br />A(n) see stamp inch ( ") inside diameter per Section 62 of the current Caltrans Standard <br />Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br />for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> <br />The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br />roadway pavement to right-of-way (front property) line shall be surfaced with a two inch (2") minimum of asphalt <br />concrete over a six inch ( 6") minimum compacted layer of three-quarter inch (3/4") maximum size <br />aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br />Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> <br />If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br />along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br />ment surface shall be allowed. <br /> <br />The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br />beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br />debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br />condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> <br />No pipe is required under and across driveway <br />approach at this time. However, if in the future <br />it is determined by the County that pipe will be <br />required at this location, it shall be the responsi <br />-bility of the property owner to supply needed <br />pipe per County requirements. <br /> <br />HENRY M. HIRATA, Director <br />Department of Public Works <br /> <br />By: <br />Permit Section <br /> <br />FORMS: R-17, SS/WW <br /> <br />WHITE - Permittee <br />GOLD - PWD Central File <br />YELLOW - Field Inspection <br />PINK - Permit Section <br /> <br />PW 16 (8/94) <br />