Laserfiche WebLink
z O COUNTY OF SAN JOAQUIN40 <br /> r DEPARTMENT OF PUBLIC WORKS E.P. No. <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> X <br /> STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 (Date Issued) <br /> °c'FORa DRIVEWAY ENCROACHMENT PERMIT '4 - i <br /> HENRY M. HIRATA (Expiration Date) <br /> DIRECTOR <br /> To L�: , Location: i :.L ;,t z:; tik. M I <br /> In compliance with your request of x , 19 ".5 and subject to all the terms, condi- <br /> tions and restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to construct as shown on <br /> Permit Application No. <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br /> hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) inch ( ") inside diameter per Section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br /> for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br /> roadway pavement to right-of-way (front property) line shall be surfaced with a iwo inch (2") minimum of asphalt <br /> concrete over a inch ( 4 ") minimum compacted layer of three-quarter inch (3/4") maximum size <br /> aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br /> Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br /> ment surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> HENRY M. HIRATA, Director <br /> Department of Public Works <br /> By <br /> Permit Section <br /> FORMS: R-17,SS/WW WHITE-Permittee GOLD-PWD Central File YELLOW-Field Inspection PINK-Permit Section PW 16(8/94) <br />