My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EP-95-067
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
1995
>
EP-95-001 thru EP-95-100
>
EP-95-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2026 3:56:09 PM
Creation date
12/31/2015 12:01:49 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-95-67
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
1995
Location
N/S Fof E. French Camp Rd. 529' W/O HWY 99 on ramp
Type - Permit Process
Trench
Bell Hole
Address
P.O. Box 930, Stockton,CA 95201
Application
P.G. & E.
Project #
73052-6
Type
Encroachment Permit
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENCRCAACHMENT PERMIT <br /> <br />E.P. No: 95-067 <br />Date Issued: 4-3-95 <br />Expiration Date: 11-1-95 <br />Job No.: 73052-6 <br /> <br />To: P.G. & E. <br />P.O. Box 930 <br />Stockton,CA 95201 <br /> <br />Encroachment Type: Trench, Bell Hole <br />Location: N/S French Camp Rd. 529' W/O HWY 99 on ramp <br /> <br />In compliance with your request of 3-34, 19 5 , permission is hereby <br />granted to do work in County right of way as shown on attached application and subject to <br />all the terms, conditions and restrictions written below or printed as general or special <br />provisions on any Evart of this form. See reverse side and attached sheet, if any. <br />Trench excavations for service connection, will not be permitted within ten feet (10') <br />of pavement centerline unless otherwise approved by the Director. Surface of trench patch-; <br />shall match in kind and be smooth and even with that of abutting surface. Special attentic,n <br />shall be given to depth of utilities through roadside area in anticipation of future drain- <br />age facilities, road profile and/or frontage development_. All underground utility facili- <br />ties are to be established and accurately dimensioned on sketches from surveyed centerline <br />of road right of way, not from right of way (border) lines. <br />The Department of Public Works, Field Inspection Section shall receive a notice at <br />least forty-eight (48) hours prior to beginning any work within the County right of way. <br />All work performed under this permit shall conform to the rules and regulations pertain- <br />ing to safety established by the California Divis..on of Industrial Safety and Cal -OSHA. <br />The jobsite shall be kept .in a safe condition at all times by the daily removal of - <br />any excess dirt or debris which might be a hazard to either pedestrian or automobile <br />traffic. All necessary traffic convenience and warning devices and personnel shall be <br />provided, placed and maintained by and at the sole expense of the Permittee in accordance <br />with the latest edition of the CALTRANS Manual of Traffic Control. <br />After completion of the work permitted herein, all debris, lumber, barricades, or any <br />excess material shall he removed and the jobsite left in a neat workmanlike manner.. <br />Immediately following completion of construction permitted herein, Permittee shall fill <br />out and mail notice of completion provided by Grantor. <br />Est. Permit Fee: $ <br />FORMS: <br />ila/f k`rN, <br />WHITE - Permit te(r <br />GOLDENROD - PWD Central File <br />YELLOW - Field Inspection <br />PINK - Permit Sectic,n <br />HENRY M. HIRATA, Director <br />Department of Public Works <br />By <br />lermi_t Section <br />PW 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.