Laserfiche WebLink
•COUNTY OF SAN JOAQUIN <br /> �o. .coG DEPARTMENT OF PUBLIC WORKS E.P. No. <br /> 2' :Z <br /> tqc < P.O.BOX 1810-1810 E.HAZELTON AVENUE 4-3-93 <br /> 9 <br /> STOCKTON,CALIFORNIA 95201 <br /> •' '• (209)468-3000 <br /> (Date Issued) <br /> vFORa DRIVEWAY ENCROACHMENT PERMIT 4.- <br /> HENRY M. HIRATA (Expiration Date) <br /> DIRECTOR <br /> r <br /> TO: Location: <br /> In compliance with your request of 1-36 , 19 `5 and subject to all the terms, condi- <br /> tions and restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to construct as shown on <br /> Permit Application No. ` `- 6tis�: <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br /> hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) <"` ve. inch( I ") inside diameter per Section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br /> for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br /> roadway pavement to right-of-way (front property) line shall be surfaced with a iwo inch (2") minimum of asphalt <br /> concrete over a 1"1`' inch 11 ") minimum compacted layer of three-quarter inch (3/4") maximum size <br /> aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br /> Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br /> ment surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> HENRY M. HIRATA, Director <br /> Department of Public Works <br /> By <br /> } <br /> Perrnit Section <br /> t. <br /> FORMS: R-17, SS/WW WHITE-Permittee GOLD-PWD Central File YELLOW-Field Inspection PINK-Permit Section PW 16(8/94) <br />