Laserfiche WebLink
*1COUNTY OF SAN JOAQUIN • - ' f'N `'" <br /> r y DEPARTMENT OF PUBLIC WORKS E.P. No. <br /> 4V P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 (Date Issued) <br /> ��/PORa DRIVEWAY ENCROACHMENT PERMIT I--1.-9(. <br /> HENRY M. HIRATA (Expiration Date) <br /> DIRECTOR�t <br /> To. R 41�.. t 4LP�i t( il�)4 Z r , i t t <br /> J ��•:; Location: <br /> %t 'rte <br /> r� <br /> In compliance with your request of 9-- , 19 95 and subject to all the terms, condi- <br /> tions and restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to construct z,=1G dvA'.v:--w"./ as shown on <br /> Permit Application No. 9.5-3 1',- 41w� <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br /> hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) c w-I v- inch( i r` ") inside diameter per Section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br /> for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br /> roadway pavement to right-of-way (front property) line shall be surfaced with a two inch (2't) minimum of asphalt <br /> concrete over a s Liu r inch (") minimum compacted layer of three-quarter inch (3/4")maximum size <br /> aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br /> Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br /> ment surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> HENRY M. HIRATA, Director <br /> Department of Public Works <br /> By <br /> Permit Section <br /> FORMS: R-17,SS/WW WHITE-Permittee GOLD-PWD Central File YELLOW-Field Inspection PINK-Permit Section PW 16(8/94) <br />