My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_EP-02-01 thru EP-02-50_ - EP-02-01
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2002
>
EP-02-01 thru EP-02-50
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_EP-02-01 thru EP-02-50_ - EP-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:27:01 AM
Creation date
1/4/2016 7:53:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-02-01
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2002\EP-02-01 thru EP-02-50
Year2
2002
Supplemental fields
DocCategory
E-Mail
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
POUIN <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR <br /> ���C r�` (209)468-3000 FAX(209)468-2999 <br /> •cq��FOQi+P 1 � www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR y''c <br /> JAMES F.PAYTON Wetting fcr YOU <br /> BUSINESS ADMINISTRATOR <br /> MANUEL SOLORIO <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> November 14, 2002 <br /> City of Stockton <br /> 425 North EI Dorado Street <br /> Stockton, California 95202 <br /> SUBJECT: MODIFICATION OF ENCROACHMENT PERMIT NO. 02-01 <br /> Gentlemen: <br /> This letter is in response to your request for allowance of work beyond the November 15, 2002, <br /> cutoff date specified in Special Condition No. 1 of the modification, dated October 14, 2002, <br /> of your Encroachment Permit. Your request is hereby approved subject to the following <br /> conditions: <br /> 1. Work within the channel of Weber Slough shall be allowed between November 15, 2002 <br /> and December 15, 2002, provided that weather and Weber Slough conditions are <br /> favorable. Furthermore, no work shall be allowed within the Weber Slough channel <br /> between December 15, 2002 and April 15, 2003. <br /> 2. The Permittee shall be responsible for any and all damage to governmental or private <br /> property, which may occur due to rainfall or flooding, as a result of the activities <br /> connected with the construction of the facility approved by this Permit. <br /> If you have any further questions on this matter, please contact me at 468-3060. <br /> Sincerely, <br /> SAMEER SHARIDEH <br /> Engineer II <br /> SS:tee <br /> FC-2K057-E1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.