" GENERAL PROVISIONS_
<br /> 1Y 7L'IJ tIm.rr TI.rCT AiT i A T7llTi r1L'C+i 7v C�Tm T.A�n nmr,rrr.mrmr.c� A�.m n7nni TwiCC�TI7TTLiiTi!"�llT i/.T'T'V DQ ATS-D F(-�T7'i'C`v1R_jT.7 A V
<br /> J Y Ei151'i11Y LT llT l -' Al llliV vi• TD
<br /> orl -TRI-3 ..1 Utc.GJ tiL\'11 rJ.rJ:.Lll�LiJ YY111211`(LVVLV 1 1 l�yralr lvviiiv ♦Y LA-,
<br /> 'UBLIC CONVENIENCE AND SAFETY:
<br /> A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any
<br /> prolonged period of time,the Permittee shall notify the known users of the respective thoroughfare(s)involved,and shall provide access for vehicular and
<br /> pedestrian traffic to and from the road
<br /> 1 Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane of the existing County road traveled way will be
<br /> maintained open to public traffic during working hours in a smooth and safe riding conditioa(s).Two lanes shall be open after working hours. '
<br /> 2. In cases where road closure is permitted,the permission to close the road will be granted under the condition that tht Permittee note-y-the following
<br /> persons and/or agencies of the time,the period of closure,and tae detour route at least twenty-four(24)hours prior to said road closure.
<br /> a.The County of San Joaquin Public Works Deparhnent d The local fire district
<br /> b.The County of San Joaquin Sheriff s Office e.The local school district
<br /> c.Tht local postal service - f.The local residents involved
<br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagamm as may be necessary shall be.provided
<br /> Dy the Permittee and stationed in advance of work to warn and direct traffic.
<br /> :. Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with
<br /> )articular attention to be taken in this regard after dart
<br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be
<br /> -emoved from tlit job site daily.
<br /> STRUCTURES: "
<br /> 4: Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed.in such away as to create a
<br /> A 7.ard or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road ri=ghts-of-way shall
<br /> oaform to-the following American Association of State Highway and Transportation Officials(AASHTO)designations.
<br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diameter,extra strength concrete pipe conforming to AA.SHTO-De'signatioa M 170M.
<br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO designation M 170M Class IIL
<br /> 3.Plastic pipe conforming to AASHTO D;sigaation M 294.
<br /> Ail concrete pipe j Cants within County road rights-of--way shall be sealed zpPalnst leakage and/or infiltration with rubber gasket in conformance with
<br /> ectioa:65-1.06 of tae California Standard Specifications,or with other methods as may'permitted under die Special Provisions.
<br /> Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shah not tie installed within the County road
<br /> _ghts-of-way urless.specifically so stated in the Special Provisions,and only.ender the conditions as provid.-d.
<br /> D. All structures to be buried within the County road rights-ofway shall be set at such elevadons as to allow minimum coverage of thirty inches(30'�to
<br /> at,centerline of the roadways and twelve inches(12")at the bottoms of borrow ditches each side of the roadways.Thee depths of structures shall be established
<br /> Blow a flat plant extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves.etc.not
<br /> icluded.Future surface.elevatioas shall be.anticipated.as nearly as possible and structure elevatioas shall be established.for fatare,adjustmentaccordingiy.
<br /> The County bemby reserves the right to'specify in the Special Provisions the gage and.surface treatment of any galvanize3-comikatted metal pipe that is to
<br /> )e installed
<br /> All longitudinal utility facilities art to be established(and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of-wap
<br /> :)order)lints.'
<br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY:
<br /> All excavations shall be backfilled and compacted immtdiateIy after work therein has been compieted
<br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet tithe rear thereof,unless otherwise pzrmitted
<br /> y.the Engineer.
<br /> Unless otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in such a manner that the relative
<br /> impaction throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench Detail-
<br /> . Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot
<br /> here 90%compaction is required,and two feet where 80%Compaction is required
<br /> No portion of the excavation(s)shall be compacted by ponding or-jetting unless a maintenance bond is provided-
<br /> Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a bigh-frequency
<br /> iternal.vibrator,the compactor to be a size and type approved by the Engineer..Points of compaction shall be nota eater than 18"centers and to the full
<br /> epth of tine lift
<br /> i. MI pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head w.Ils,road signs,trees,shrubbery,and/or other permanent road facilities
<br /> apairtd by or as a result of construction operations at the construction site(s),or at other grouad(s)occupied by materials and/or equipment,shall be
<br /> storedimmediately upon baci�ftIiag of the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior
<br /> construction.
<br /> L All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within
<br /> NE WEEK following tare backfilling of excavation,weather permitting,with compacted layers.of surfacing materials at least as duck as the existing,and no
<br /> ss than two inches(2")of asphalt concrete over six inchts(6")of aggregate base,both as_specifiedbelow_
<br /> 1.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum
<br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bituminous binder to bt mixed with
<br /> mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directtd by the Engineer.Placement of asphalt
<br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications.
<br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")mamirn=size aggregate
<br /> Class 2 Aggregate Base specifiedin Section 26 of the California Standard Specifications
<br /> Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the
<br /> Mstraction areas left in a neat and presentable coaditioa(s).
<br /> 1.If necessary,County road traveled way amd driveway pavements shall be washed with water to remove dirt and dust-
<br /> 2.
<br /> ust2.Driveway approaches and field eatanoe pavements damaged by equipment or spoil banks shall be repaired as directed by the Eagine s.-
<br /> Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall bt repaired immediately by and at the sole expense o€.,
<br /> LC Permittee for a period of one year following acceptance of the work.
<br />
|