Laserfiche WebLink
SECTION 10 <br /> Federal Aid Project <br /> B) CONSTRUCTION <br /> Do not construct rumble strips on structures or approach slabs. Construct <br /> rumble strips as specified in the plans. The grinding equipment must be <br /> equipped with a sighting device enabling the operator to maintain the rumble strip <br /> alignment. <br /> Indentations must comply with the specified dimensions within 0.06 inch or 1/16 <br /> inch in depth and 10 percent in length and width. <br /> Finished rumble strips not meeting the specified tolerances, shall be brought <br /> within tolerance by either abrasive grinding or removal and replacement. The <br /> corrective method will be selected by the Engineer. Ground surface areas shall <br /> be neat and uniform in appearance. The corrective work shall be at the <br /> Contractor's expense. <br /> The grinding equipment must be equipped with a vacuum attachment to remove <br /> residue from the roadbed. Dispose of removed material under Section 7-1.13, <br /> Disposal of Material Outside the Highway Right-of-Way," of the Standard <br /> Specifications. <br /> On ground areas, apply fog seal coat under Section 7-1.13, "Seal Coats," of the <br /> Standard Specifications. <br /> C) MEASUREMENT AND PAYMENT <br /> The contract items for Centerline Rumble Strip (AC, Ground-in Indentation) and <br /> Edgeline Rumble Strip (AC, Ground-in Indentation) are measured by the linear <br /> foot along the length of the rumble strips without deductions for gaps between <br /> indentations. <br /> The contract price paid per linear foot for Centerline Rumble Strip (AC, Ground-in <br /> Indentation) and Edgeline Rumble Strip (AC, Ground-in Indentation) includes full <br /> compensation for furnishing all labor, materials, tools, equipment, and <br /> incidentals, and for doing all the work involved in constructing Centerline Rumble <br /> Strip (AC, Ground-in Indentation) and Edgeline Rumble Strip (AC, Ground-in <br /> Indentation) complete in place, including furnishing and applying fog seal coat to <br /> the actual ground areas, as shown on the plans, as specified in the Standard <br /> Specifications and these special provisions, and as directed by the Engineer. <br /> (SPECS\2009\FED-10-9-10-23) 10-20 <br /> AIRPORT-FED-1 0-9-10-23-AT <br />