My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1303001 thru PS-1303500_ - PS-1303096
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1303001 thru PS-1303500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1303001 thru PS-1303500_ - PS-1303096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:21:04 PM
Creation date
12/30/2015 6:39:27 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1303096
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1303001 thru PS-1303500
Year2
2013
Supplemental fields
Applicant
RECLAMATION DISTRICT NO. 548
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
MAINTAIN TRAFFIC CONTROLS FOR ALL ROADS.
Owners
Parcel Address
BOTH S OF GLASSCOCK RD. 0.5 MILE N/O HWY 12
Primary Parcel
Type (2)
PS-1303096
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PS-1303096 January 6,2014 <br /> SPECIAL CONDITIONS FOR RECLAMATION DISTRICT NO. 548 GLASSCOCK ROAD <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes for local <br /> traffic. Two-way traffic shall be maintained during non-working hours with excavated areas <br /> backfilled or plated. During working hours, lane closure shall be used within the road closure to <br /> regulate local traffic thru immediate work zone. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 4. Emergency responder access to effected residences shall be maintained at all times. <br /> 5. Any areas where parking is to be affected shall have signs noticing the time period placed at least <br /> 48 hours in advance of the work. <br /> 6. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31 unless authorized by the County. <br /> 7. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 8. The permittee is responsible for Survey Monuments disturbed by trenching and is required to file <br /> a corner record and to reestablish them using a Licensed Land Surveyor after the trench <br /> restoration in completed. <br /> 9. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 10. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by the Permittee. The Permittee shall be responsible <br /> for any and all costs associated with the removal, relocation and/or adjustment of these facilities <br /> as determined by the County at the Permittee's expense. (Streets and Highways Code 1463) <br /> 11. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 12. Pipeline shall be on a straight grade a minimum of 30" below ditches or toe of embankment slope. <br />
The URL can be used to link to this page
Your browser does not support the video tag.