Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br /> F. For trenchless excavations greater than three feet in depth of cover over the utility <br /> facility, and not requiring a significant surface incision greater than industry bore <br /> pit standards. <br /> Exceptions must be requested and submitted in writing to the Department. Payment ofa non- <br /> refundable prodessing fee-is also required. Exceptians will be reviewed using the Department s <br /> Action Approval process, which requires the recommendation of a Deputy Director. <br /> SASUSANVROCEDURESMIDDRAFT NOCHANGES 3-12-12DDC PAGE 3 OF 3 <br /> REVISED D9-12.12 <br /> REVISION N0 22 <br />