Laserfiche WebLink
EXHIBIT 2 <br /> I. If the distance between arose—cuts -are less then 950' the entire area <br /> between cross—cuts shall be planed and resurfaced with one (9) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to Cdunt� Standard <br /> Drawing No.- R®29. <br /> 3. - Resurfacing for Bell Doles shall rneet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 950' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3990.,E (5-2). <br /> cy <br /> � O <br /> L _ <br /> Paved Shoulder— i X CD Q <br /> I ao <br /> a� <br /> j- <br /> W <br /> _T _oi_ <br /> • O <br /> q <br /> - <br /> ¢Ab <br /> ' I <br /> • of j I . . <br /> zt , <br /> W <br /> t <br /> J <br /> X41 <br /> 0 U <br /> 0 <br /> rn <br /> t I I E o <br /> JU <br /> PL <br /> - CROSS CUTTING OF <br /> �. <br /> COUNTY ROADWAYS <br /> �'' COLFA7Y OF SAN .TOAQ <br /> UIZV <br /> �-p y DEPA-MiEtT or PUBLIC WORKS <br /> Ch- gyp; I Date: 3/2-4/1?- <br /> . - <br />