Laserfiche WebLink
REQUIRED MEASUREMENTS: <br /> 1.RIGHT OF WAY(EDGE OF PAVEMENT, FACE OF CURB,ETC.) <br /> 2.CENTER LINE (EDGE OF PAVEMENT, FACE OF CURB, ETC.) <br /> 3. OUR FACILITIES TO NEAREST EDGE <br /> 4.STREET CUT TO CLOSEST X-STREET <br /> N <br /> 5. TUXEDO -i�% <br /> \N n <br /> � I <br /> l�1 <br /> a <br /> - I <br /> i <br /> UEAD END <br /> The excavation,construction;and/or otherwise encroachment will take place on Highway Right-of-Wa the <br /> _ G7' side of G-s r<,1 711 t(-�E ANE approximately 11[ fee mile <br />