Laserfiche WebLink
GF,NF:R A L PRO VIS IONS <br /> c 7�D i n t rr n rr T A T i n r rnr r nr air ro c rm n A r- r.m m r c. x*r�r,Ip rc o c+crrrrr_rrnr Col rwrmv n�i�-R7 T(-=S-lR_Txr n v <br /> J ri:iutuV�r llVJi .-itrvrV vi JuvJ vitL'liL.t;S1RUl�i Ut�L�J tirYll rir-�11V UJ rrIi FUN t.v TNi i - <ci t. <br /> ?UBLIC CONVENIENCE AND SAFETY: <br /> A- Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank equipment or other barrier permitted for any <br /> prolonged period of time, the Permittee shall notify the known users of the respective thorougbfare(s)involved,and shall provide access for vehicular and <br /> pedestrian traffic to and from the road <br /> I Unless otherwise permitted,all work shall be conducted in such a manner that no less than one Lane of the existing County road traveled way will be <br /> maintained open to public traffic during working hours in a smooth and safe riding coadidou(s).Two lanes shall be open after working hours. <br /> 2. In cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify-ffie following <br /> persons and/or agencies of the time,the period of closure,and the detour rode at least twenty-four(24)hours prior to said road closure. <br /> a.The County of San Joaquin Public Works Department d-The local fine district <br /> b.The County of San Joaquin Sheriffs Office e.The local school district <br /> c_The local postal service - f.The local residents involved <br /> g. Should hazardous conditions relative to the iastallalioa operations warrant flagmen,as many capable rlagr=as may be necessary shall be provided <br /> Dy the Permittee and stationed in advance of work to warn and direct traffic. <br /> Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with <br /> rarticular attention to be taken in this regard after dark. <br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be <br /> -(-moved from the job site daily. <br /> STRUCTURES: <br /> Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed.in such a way as to create a <br /> a=d or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road ruts-of-way shall <br /> deform to tie following American Association of State Mghway.and Transportation Officials(AASHTO)designations. <br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diarnetcr,extra strength concrete pipe conforminn v tn'Ap SHTO D ignatioa M l70M <br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe coafo-mina to AAS=designation M 170M Class III. <br /> 3:Plastic pipe conforming to AASHTO Designation M 294. <br /> -of-way shall be sealed against leakage and/or Lnfltration with rubger gasket in conformance with <br /> All concrete pipe j oints within County mad rights <br /> tzctioa�65-1:05 of the California Standard Specifications,or with other methods as may'permitted under the Special Provisions. <br /> Cast-in-place concrete pipe,vitrified clay pipe,spinal welded steel pipe,or cod ugatsd aluminum alloy pipe shall.not be installed within the County mad <br /> �rats-of-way unless.specifically so stated in the Special P ovisioas,and only under the conditions as provided <br /> D. All structures to be buried within the County road rights-of-way shall be set at such elevations as to allow un n+mnm coverage of thirty inches(30'�to <br /> ie centerline of the roadways and twelve inches(12")At the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established <br /> Blow a flat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves.etc.not <br /> icluded Futam surface-elevations shall bc.antieipated.as nearly as possible and structure elevations shall be established.for future adjusimentaccordiney. <br /> The County hereby reserves the right to specify in the Special Provisions the gage and.surface treatinent of any galvanized'conua ted mesal pipe that is to <br /> )e installed <br /> All longitudinal utility facilities are to be established(and dimensioned on sketches)from surveyed•centerline'af road right-of-wzy,not from Hgbt-of-wap <br /> :,order)Ernes.' <br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY: <br /> All excavations shall be backfilled and compacted immediately after work therein has been compieted <br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise pzrmitted <br /> Y the Engineer. <br /> Unless otherwise permitted un the Special Provisions,backfill shall be placed andmechanically compacted in such a manna that the relative <br /> Dmpaction throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench Detail_ <br /> . B ackfill material sha11 be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot <br /> 'here 90%compaction is required and two feet where 80%compaction is required <br /> No portion of the excaw tion(s)shall be compacted by ponding or jetting unless a maintenance bond is provided. <br /> Gravel backfill material shall be utilized only where Specifically so stated on the face of the permit It shall be compacted by means of a high-frequency <br /> iternal.vibrator,the compactor to be a size and type approved by the Ehgineer..Poiut;of compaction shall be not greater than 18"centers and to the full <br /> spth of the lift <br /> 'r. ALT pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head wills,road signs,trees,sbrubbccry,and/or other permanent road facilities <br /> mpaired by or as a result of construction operations at the construction site(s),or at other grouad(s)occupied by materials and/or equipment,shall be. <br /> stored=mmmtdately upon backfilling of the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior <br /> construction. <br /> L An surfacing materials of roadways and driveway approaches cut or da moved by or as a resit of constru on opera rens,shall be rephced within <br /> NE WEEK following the backfilling of excavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing and no <br /> ss than two inches(2-)of asphalt concrete over six incb=(6")of aggregate base,both as.specified below_ <br /> L.Asphalt Concrete Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum <br /> aamegate,coarse or medium gradation as specified in Section 39 of the California Standard Specifications.The bituminous binder to be nixed with <br /> mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt <br /> coacretr surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggregate Base:Combined mineral nggr agates shall conform to the quality and the grading for tbree-quarter inch(3/4")maximum size aggregate <br /> Class 2 Ayggregate Bas=specified in Section 26 of the California Standard Spxifications <br /> Before acceptance of repairs to tae County read rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the <br /> m,.sm=ou areas left in a neat and presentable coadition(s). <br /> L If necessary,County road haveled way and driveway pavements shall be washed with water to remove dirt and dust <br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Eneinees.- <br /> Upon request by the County,any senlem:ni sagging of surface,or cranking of pavement shall be repaired immediately by and at time sole expense of, <br /> L-_Permittee for a period of one year following acc--pta.nce of tame work <br /> I <br />