Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPERVLSI.ON: The utility company(permittee) shall furnishfull-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START Off'WORK: No work within the County right-of-way shalt be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside th'e area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAIZ,Y:RFSTORATION: Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEA.THER41CHYCONDITION: Ail trenches shall be fled and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />