Laserfiche WebLink
GENERAL PRO VIS IONS <br /> 1T TG'D hTTT r!-�r-�.rc�FT''A T i A'TTlll,i nt;Czrro ct7m r-A rn� nmr�rr�r•r mus c� a n r+`T+T`r TT.TC('TTT7*T'LTTl.7!"TniT T` Y ao A n-D T(R'I'CTIR-Cr7 A V <br /> J ri:lututLr llY 1^`' •I111V 1t Vl'JI.JUJ VStL"riV1^i J r:ic i-1l.i VtL2".J IiLY�r1S1✓LL1Y LiJ Y;7 lTF t l.tJVr'(1 1 i`vtvi i t r•L 1. <br /> IU-BLIC CONVENIENCE AND SAFETY: <br /> A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any <br /> prolonged period of time,the Permittee shall notify the known users of the respective thorougbfare(s)involved,and shall provide access for vehicular and <br /> p edestrian traffic to and from the road <br /> I Unless otherwise permitted,all work shall be conducted in such a manner that no less than oat,lane Of the existing County road traveled way will be <br /> maintained open to public traffic during working hours in a smooth and safe riding condrtiou(s).Two lanes shall be open after working hours. <br /> 2. In cases where road closure is permitted,the permission to close the road will be granted under the condition that-the Permittee notify-the following <br /> persons and/or agencies of the time,the period of closure,and the detour route at least twenty-roux(24)hours prior to said road closure. <br /> a.The County of San Joaquin Public Works Department d.The local fire district <br /> b.The County of San Joaquin Sheriffs Office. e.The local school district <br /> C.The Iotal postal service - f.The local residents involved <br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be.provided <br /> Dy the Permittee and stationed in advance of work to wam and dire:-traffic. <br /> a Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with <br /> iar(icalar attention to be taken in this regard after dark <br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,sball be <br /> :embved from the job site daily. <br /> STRUCTURES: - <br /> 4, Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed in such a way"as to create a <br /> -a=d or mainte nance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall <br /> onform to the following American Association of State lfighway and Transportation Officials(AASHTO)designations. <br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diameter,ertra strength concrete pipe conforming to AASHTO Designation M 170Nt <br /> 2.Por concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrote pipe conforming to AASHTCTTC)designation M 170M Class III. <br /> T Plastic pipe conforming to AASHTO Designation M 294. <br /> A1I concrete pipe j oints within County road rights-of-way shall be sealed against leakage and/or infiltration with rubber gasket in conformance with <br /> ection�66-1.06 of the California Standard Specifications,or with other methods as may.permitted under the Special Provisions- <br /> _ Cast-in place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corcugared aIumnum alloy pipe shall not be:installed within the County road <br /> tights-of-way urless.specifically so stated in tine Special Provisions,and only under the conditions as provided. <br /> 3. All structures to be buried within the County road rights-of--way shall beset at such elevations as to allow 7niniz-an coverage of thirty inches(30'�m <br /> is centerline of the roadways and twelve inches(12")at the bottoms of borrow ditches each side of fire roadways.The depths of structures shall be estab`icFie t <br /> elow a flat plane extending across the rights-of-wap,no part of which shall extend above the elevations stated above,manholes,lamplwles,valves.etc.not <br /> -Ir-luded.Future surface-elevations shall be.anticipated.as nearly as possible and structure elevations shall be established.for-h=t• adJustmeutaceozditLey. <br /> The County hereby reserves the right to specify in the Special Provisions the gage,and.surface tr atnz^t of guy galvanized-corrugated metal pipe that is to <br /> ie installed <br /> All longitudamal lidlity facilities are to be established(and dimensioned on sketches)from surveyed-centerline-of road right-of-wag,riot-from iigbt-of-way <br /> corder)lines.' <br /> REPAIRS OF THE COUNTY RIG17IT-OE-WAY: <br /> All excavations shall be backfilled and compacted immediately after work therein has been completed. <br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise pernmitted <br /> Y the Engineer. <br /> Unlrss otherwise permitted under_the Special Provisions,backfill shall be placed and mechmanicalIy compacted in such a manner that the relative <br /> jmpazdon throughout the entire fill within conform to County road right-of-way shall conforto the percentagrss of compaction as shown on the Trench Detail <br /> . Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot <br /> here 90%compaction is required,and two feet where 80%compaction is required <br /> No portion of the excavation(s)shall be compacted by ponding or-jetting-unless a maintenance bond is provided. <br /> Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a bigh-frequency <br /> iternal_vibrator,the compactor to be a size and type approved by the Eagineer..Points of compaction shall be not greater than 18"centers and to the full <br /> epth of the lift <br /> L All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,road signs,trees,sluubbtry,and/or other permanent road facilities <br /> apaired by or as a result of construction operations at the construction site(s),or at other gronnd(s)occupied by materials and/or equipment,shall be <br /> storedinmmediately upon back Ting of the excavation to the original grades and cross sections,aad to a condition as good as,or better than existing prior <br /> construction <br /> L All surfacing materials of roadways and driveway approaches cut or d=a ed by or as a result of construction operations,shall be replaced within <br /> NE WEEK following the backfilling of excavation,weather permitting,with compacted layers,of surfacing materials at least as thick as the existing,and no <br /> ss than two inches(2")of asphalt concrete over sig iuches(6")of aggregate base,both as-specified below. <br /> 1.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gm dation requirements for Type`B"one-half(i/2")ma rim irm <br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specificarions.The bituminous binder to be mired with <br /> mineral aggregate shall be paving asphalt having(Grade PCr 64-10),unless otherwise,directed by the E aoineer.-Phacemeut of asphalt <br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggrec"atc Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3J4")maximum six aggregate <br /> Class 2 Aggregate Base sptcifiedin Section 26 of the California Standard Specifications <br /> Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental diM dust and/or debris shall be removed and the <br /> s-ustr=ou areas left in a neat and presentable condition(s). <br /> L h necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dist <br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as duetted by the Engineer._ <br /> Upoa request by the County,any setrlement sag-ging of surface,or cracking of pavement shall be repairedd immediately by and at the sole expense bf, <br /> it Permttre for a period of one year following acctptance of the work <br /> I <br />