Laserfiche WebLink
Wiater Weather UtUity Wozk <br /> 1: SUPERVISI:O The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full complianoe with the permit provisions. <br /> 2. START OF WORD: No work wfthin the County right-of-way shall be starste'd until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can-be accomplished under the provisions ofAtlie permit. <br /> 3. QLFEANPANE1Y.E NT: Dirt and mud shal[ not,bei deposited on the paverherit <br /> outside the area of work, and if inadvertently tracked onto t[ie road travel vvay Shall <br /> be removed immed[atelyr. <br /> 4. DAM Y:RE,STGkAT1bN: Private driveways and road intersections shalt be restored <br /> daily <br /> S. W_EA_THER.:TIGRT•CONDTTION: Ail trenches shall be filfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> 1 <br />