Laserfiche WebLink
Winter Weather Utility Work <br /> 1. <br /> SUPERVISION: The utility company(permittee) shall furnish.full-time supervision r <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORD: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of wont, and if ihadverten'ily tracked onto tFie road travel way shall . <br /> be removed'immediately, <br /> 4. DAM Y:RESTOP.ATlbN:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEA.TREKiTIGEITCONbITION: All trenches shall be filled and'compacted, <br /> ditches an other drain' age facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> i <br /> S <br />