Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORD: No work wfthin the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CIIFAN PAVEWNT: Dirt and mud shall not'be deposited on the pavement <br /> outside time area of work, and if!hadvertentdy tracked onto the road travel-way shall . <br /> be removed immediately. <br /> 4. DAIUY:RESTORATIbN:• Private driveways and road intersections shalt be restored <br /> daily <br /> 5. WEATHER-TWEIT'CONDITION: Ail trenches shall be fiffed and*compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />