Laserfiche WebLink
OTEa EXHIBIT 2 <br /> I. If the distance between cross—cuts _are lessthen 150' the entire area <br /> between cross—cats shall be Maned and resurfaced with one (1) inch of <br /> R-sphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard <br /> Drawing No.- R®29. <br /> 3. - Resurfacing for Bell Holes shall Meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3910.3 (8-2). <br /> cyr <br /> � O <br /> • U�U <br /> � O <br /> y <br /> Paved Shoulde (D Q <br /> t U U`+- <br /> O <br /> w I I Q) <br /> 6 <br /> 0 <br /> ID <br /> D t EL <br /> CD <br /> o <br /> O <br /> co <br /> U <br /> F- o <br /> _j U <br /> - CROSS CUTTING OF <br /> COUNTY ROADWAYS <br /> COEWrY F SAN -TOAQUZZV <br /> D_-12ARTI?DaTT Or PUB1.iC Top 4 <br />