PS -1400635 <br />SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />November 26. 2012 <br />Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non -working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2. Access to all properties shall be maintained at all times except when work is occurring at the <br />access point. Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3. Residents and businesses shall be notified in writing, as approved by the County, 48 -hours in <br />advance of any impacts to their access. <br />4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br />least 48 hours in advance of the work. <br />5. Existing fences shall not be removed without written consent signed by the property owner and <br />submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br />better materials at the edge of the right-of-way. <br />6. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br />corner record to reestablish them using a Licensed Land Surveyor. <br />7. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br />and frames and covers shall be maintained by PG&E. PG&E shall be responsible for any and all <br />costs associated with the removal, relocation and/or adjustment of these facilities as determined <br />by the County at PG&E's expense. (Streets and Highways Code 1463) <br />8. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />9. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times. <br />10. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br />County right-of-way. Where the existing road structural section is below standard, a minimum <br />section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br />11. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br />paved shoulder. <br />12. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />