Laserfiche WebLink
Winter Weather Utility Work <br />1. SUPERVISION: The utility company (permittee) shall furnish full-time supervision <br />of all work to insure full compliance with the permit provisions. <br />2. START OF WORK: No work within the County right-of-way shall be started until the <br />utility company representative has made an evaluation of weather conditions and has <br />determined the work can be accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br />outside the area of work, -and if inadvertently tracked onto the road travel way shall <br />be removed immediately. <br />4. DA.ILY:RESTORATION: Private driveways and road intersections shall be restored <br />daily <br />5. WEATHER-TIGHT,CONDITION: All trenches shall be filled and compacted, <br />ditches an other drainage facilities regraded and opened, and the entire work area <br />restored to weather -tight condition prior to any rain. <br />CII . <br />