Laserfiche WebLink
PS-1400848 September 16, 2014 <br /> SPECIAL CONDITIONS FOR <br /> TEICHERT TUNNEL— BIRD RD. <br /> ENCROACHMENT PERMIT <br /> in ained on Bird Road or the <br /> Maintain traffic controls for all roads. Two-way t <br /> 1. Y traffic shall be ma <br /> bypass road at all times. Traffic control delays shall not exceed 15 minutes. <br /> 2. Residents and the Vernalis area quarries shall be notified in writing 72 hours (min) in advance of <br /> the impacts to Bird Road. <br /> 3. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 4. By-pass road shall be fully constructed in place by November 1. <br /> 5. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31, unless authorized by the County. <br /> 6. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 7. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br /> corner record to reestablish them using a Licensed Land Surveyor. <br /> 8. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 9. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 6.5-inches thick by 4-foot wide. <br /> 10. School buses shall be passed through the work zone with minimal delays. <br /> 11. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 12. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 13. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 14. All future maintenance of permitted improvements within the County right-of-way will require a <br /> San Joaquin County Department of Public Works encroachment permit. <br /> 15. The obligation for repair and maintenance is a required condition for the approval of this <br /> encroachment permit with San Joaquin County. Applicant shall be responsible for the <br />