Laserfiche WebLink
r <br />EXHIBIT 2 <br />I. if the distance between cross—cuts are less then 950' the entire area <br />between cross—cuts shall be planed and resurfaced with ane (9) inch of <br />A#halt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard <br />Drawing NO.' R®29. <br />3.- Resurfacing for Bell boles shall meet these requirements. if excavation occurs <br />within the shoulder or lane, only that area shall be resurfaced as shown. <br />4. if cross—cutting is performed on kcal Roads at intervals less then 150' a <br />Seal Coat for that half of the roadway containing the trench can be used in <br />Iieu of resurfacing. Ssction 3990.3 (B-2). <br />II a) <br />n U <br />O <br />Z�: 2 <br />Paved Shoulder--1� <br />w <br />- �" �` ✓ iii -d <br />0 <br />T_ <br />CD <br />T. <br />b <br />CRSS CUTTING T INC ®F <br />COUNTY ROADWAYS <br />OUAY-17 OF SAN -TO'�AOEW <br />AM — DEPARt� l OF PU'3ISC Wo _RKS <br />Drawn by. 's c I cha: bb- I Date. e/7-4/1! <br />