Laserfiche WebLink
NOTES.- <br />I. <br />OTES.i. if the distance between cross—cuts -are fess then 9508 the entire <br />2 <br />t et teen cross—cuts shall he planed and resurfaced with One �) ares <br />A#holt Concrete. inch �� <br />2-. The resurfacing requirements sell be in addition to Cdunt} Standard <br />Drawing No.' R-29. <br />Resurfacing for Sell [doles shall meet these requirements. if excavation occurs <br />within the shoulder or lane, .rely that area shall he resurfaced as shoeyn. <br />4. If cross—cutting is Performed on Local Roads at integrals less then 95QH � <br />Seal Coat for that half of the roadway containing the trench c®n be used in <br />lieu of resurfacing. Section 3990>3 (B-2). <br />Paved Shoulder ------n-{ <br />0— <br />Li <br />T <br />O <br />T <br />T— <br />C, <br />L <br />T- <br />o <br />L <br />CRSS CUTTING OF <br />COUNTY ROADWAYS <br />w <br />911 <br />CoCIZAV7Tr OF LSA ToAC)r <br />D-E2l+Z11yjENT OFPUBI.ZC WO_RS yy <br />Drawn <br />Date. 8/24A <br />