Laserfiche WebLink
DEPARIMENI OF PUBLIC WORKS <br />F. For trenchless excavations greater than three feet in depth of cover over the utility <br />facility, and not requiring a significant surface incision greater than industry bore <br />pit standards. <br />Exceptions must be requested and submitted in writing to the Department. Payment ofa non- <br />refundable processing fee -is also required. Exceptions will be reviewed using the Department s <br />Action Approval process, which requires the recommendation of a Deputy Director. <br />S_ISUSANIPROCEDURE=-BIDDRR.rNOCHAAGES3-12-12DOC PAGE 3 OF 3 <br />REVISED 05-1-2-12 <br />REVI.SibN 140-.2-.09-1-2-1 <br />