Laserfiche WebLink
OTo . EXHIBIT 2 <br />Y. If the distance between cross—cuts -are less then 950' the entire area <br />between cross—arts shall be planed and resurfaced with o"ns (1) inch of <br />Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard <br />Drawing No.- R-29, <br />3. ' Resurfacing for Bell Holes shall meet these requirements. if excavation occurs <br />within the shoulder or lune, only that area shall be resurfaced as shun. <br />4. if cross—cutting is performed on l=ocal Roads at intervals less thea 950' a <br />Seal Coat for that half of the roadway containing the trench can be used in <br />lieu of resurfacing. Section 3910,3 (B-2). <br />Paved Should <br />W <br />CRSS CUTTING OF <br />C®U"T ROADWAYS <br />I COUNTY OF SAN -TO--AQLJW <br />D�h3T1 L Or PUBj. C 4TOZK3 <br />wfi Date'. 3/24/1 ?_ <br />