Laserfiche WebLink
GENERAL PROVISIONS- - ' <br /> Y7ED v1T7'}1�v llryJl "`T r•ALIVIV OiLI'SroJ nsl"11..L'JLL'CUL1 UL�liJ AND L�J.pELr,1,;EJ YY 1T 11�11V COT SLY i�OrW i�uviijl'S-v -i TSV <br /> ?UBLIC CONVENIENCE AND SAFETY: <br /> A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any -- --- <br /> prolonged period of time,the Pemaittee shall notify the known users of the respective thoroughfares)involved,and shall provide access for vehicular and <br /> pedestrian traffic to and from the road. <br /> 1 Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane of the existing County road traveled way will be <br /> maiactained open to public traffic during working hours in a smooth and safe riding conditioa(s).Two lanes shall be open after working hours. <br /> 2. In cases where road closure is permitted,the permission to close the road will be granted under tate condition that the Permittee notify the following <br /> persons and/or agencies of the trine,the period of closure,and the detour route at least twenty-four(24)hours prior to said road closure- <br /> a.The County of San Joaquin Public Works Department d.The local fire district <br /> b.The County of San Joaquin Sheriff s Office e.The local school district <br /> c.The local postal service - f.The local residents involved <br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be.provided <br /> by the Permittee and stationed in advance of work to warn and direct traffic. <br /> C. Lights,signs and banicades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public with <br /> partictilar attention to be taken in this regard after dark <br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by fights,signs and barricades,shall be <br /> rmnovad from the job site daily. <br /> STRUCTURES: <br /> A: Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformedin such away as to create a <br /> ward or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of--way shall <br /> :6aform to-the following American Association of State Highway and Transportation Officials(AASHTO)designations. <br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diameter,extra strength concrete pipe conforming to AASHTO Designation M 170Nt <br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO designation M 170M Class UL <br /> T.Plastic pipe conforming to AASHTO Designation M 294. <br /> t..• e sealed against leakage and/or infiltration with rubber gasket in conformance with <br /> All coacrete pipe joints within County road rights-of-way shall b <br /> :ect oa:65-1.06 of the California Standard Specifications,or with other methods as may permitted under the Special Provisions. <br /> Cast-in-place concrete pipe,vitrified clay pipe,spiral.welded steel pipe,or corrugated aluminum alloy.pipe shall not be installed within the County road <br /> ights-of-way unless.specifically so stated in the Special Provisions,and only under the conditions as provided. <br /> D. All structures to be buried within the County road rights-of--way shall beset at such elevations as to allow min,mnm coverage of thirty inches(30'�to <br /> he.centerline of the roadways and twelve inches(12")at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established <br /> )e-low a flat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves.etc.not <br /> acluded.Future surface elevations shall be,anticipated.as nearly as possible and structure elevations shall be established.for futare adjustmentaccoidingiy. <br /> E. The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvanized con-Ligated metal pipe that is to <br /> be installed <br /> F. All longitudinal utility facilities arc to be established(and duupnsioned on sketches)from surveyed centerline of road right-of-way,not from tight-of-way <br /> border)Cines. <br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY: <br /> L All excavations shall be backfilled and compacted immediately after work therein.has been compieted <br /> 3. Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted <br /> ,y the Engineer. <br /> Unlrss otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in such a manner that the relative <br /> ompaction throughout the entire fill within the County road right-of--way shall conform to the percentages of compaction as shown on the Trench Detail <br /> ). Backfill material shall be.placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot <br /> rhere 90%compaction is required,and two feet where 80%compaction is required <br /> No portion of the excavation(s)shall be compacted by ponding or-jetting unless a maintenance bond is provided <br /> Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of ahigh-frequency <br /> iternal.vibrator,the compactor to be a size and type approved by the Engineer..Points of compaction shall be not greater than I8"centers and to the hili <br /> .epth of the UfL <br /> 's. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,road signs,trees,shgibbery,and/or other permanent road facilities <br /> npaired by or as a result of construction operations at the construction site(s),or at other gronad(s)occupied by materials and/or equipment,shall be <br /> -stored-immediately upon backfilling of the excavation to the or grades and cross sections,-arid to a condition as good as,or better than existing prior <br /> )construction <br /> i. All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within <br /> )NE WEEK following the backfilling of excavation,weather permitting,with compacted Layers.of surfacing materials at least as thick as the existing,and no <br /> xs than two inches(2-)of asphalt concrete over six inches(6")of aggregate base,both as.specified below. m�r;mitrn <br /> 1.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2") <br /> aggregate,coarse or medium gradation as specified in Section 39 of the California Standard Specifications.The bituminous binder to be mixed with <br /> mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt <br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/47)maximum size aggregate <br /> Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications <br /> unsightly and detrimental dirt dust and/or debris shall be removed and the <br /> Before acceptance of repairs to the County road rights-of-way,all <br /> Destruction areas left in a neat and presentable condition(s). <br /> I.if necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust <br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer... <br /> Upon request by the-County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense of. <br /> he Permittee for a period of one year following acceptance of the work. <br /> I <br /> t\ <br />