Laserfiche WebLink
NOTES, - EXHIBIT 2 <br /> 9. If the distance between cross—cuts -are less then 950' the entire area <br /> between cess—cuts shall he planed and resurfaced with o6ne (9) inch of <br /> k;phalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to Cdunt� Standard <br /> Drawing No R-29, <br /> 3. • resurfacing for Bell Holes shall .meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shall he resurfaced as shun. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3990,3 (5-2). <br /> n D ' <br /> Uv U <br /> � O <br /> Paved Shoulde , (D Q <br /> O� D ' <br /> w aQ) <br /> Iv- <br /> . O <br /> i <br /> O <br /> CD <br /> Irl - <br /> O <br /> Z: <br /> I I <br /> �I I w <br /> O <br /> O A 41 <br /> D <br /> I <br /> F- <br /> � o <br /> �U <br /> F, Dy' <br /> - , CRSS CU 1I ING OF <br /> COU"T ROADWAYS <br /> DE2APThaNoaPUB iacWO_R�Ks E <br />