My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1401501 thru PS-1402000_ - PS-1401591
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2014
>
PS-1401501 thru PS-1402000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1401501 thru PS-1402000_ - PS-1401591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:25:36 PM
Creation date
12/31/2015 12:17:48 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1401591
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2014\PS-1401501 thru PS-1402000
Year2
2014
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC- STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S O\F WOODBRIDGE RD. 175' UPRR TRACKS
Primary Parcel
Type (2)
PS-1401591
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br /> SECTION 3900: MISCELLANEOUS SUBSECTION 3910 <br /> ORIGINAL ISSUE DATE: April 6, 1984 TRENCH CUTTING <br /> This trench cutting policy provides uniform guidelines and requirements for trenching within San <br /> Joaquin County right of way. It is intended to assist members of the public, private contractors, <br /> employees of the Department of Public Works, and any other parties trenching in-San Joaquin <br /> County. <br /> 3910.1 GENERAL REQUIREMENTS <br /> A. Resurfacing requirements specified in this policy are in addition to the trench <br /> resurfacing requirements specified by San Joaquin County Standard Drawing R- <br /> 29. <br /> B. Forthe purpose of this policy, "Surfacing Age" is defined as the age of the most <br /> recently completed roadway surfacing, .including construction, reconstruction, or <br /> major overlay. <br /> C. Where the application of seal coats is required, a Type If Slurry Seal will be used <br /> in accordance with State Standard Specifications, Section 37-2. <br /> D. The permittee must post a one-year maintenance bond or cash deposit, in an <br /> amount specified by the Department. <br /> E. All pavement markings destroyed or obliterated-must be replaced in kind by the <br /> permittee. Typical pavement markings include, but are not limited to, lane fines, <br /> centerlines, stop and stop ahead legends, limit fines, raised pavement markers, <br /> and miscellaneous delineators. <br /> F. The permittee is responsible for Survey Monuments disturbed by trenching and is <br /> required to file a corner record and to reestablish them using a Licensed Land <br /> Surveyor after the trench restoration is completed. <br /> G. Functional classification maps and Public Works Project Advertising Schedules <br /> are references for this policy. <br /> H. To facilitate scheduling and planning, Public Works staff will make available the <br /> most current Project Advertising Schedule at the monthly Utility Coordination <br /> Meeting and make it available to the public, at the Permits Counter, in January <br /> each year. <br /> 910.2 COLLECTORS ARTERIALS AND EXPRE=SSWAYS <br /> A. Surfacing Age less than Three (3) Years: No pavement cuts. Exceptions may be <br /> approved in accordance with Section 3910.4 EXCEPTIONS. <br /> B. Surfacing Age Three (3) Years and Over: <br /> 1. Longitudinal Trench Cutting in Paved Shoulder Areas: <br /> The entire shoulder of the road is to be resurfaced. The existing surfacing <br /> adjacent to the trenched area shall be planed to accommodate the overlay <br /> in a manner that does not cause drainage concerns. The nearest <br /> pavement cut shall be a minimum of three (3) feet from the edge of <br /> pavement, or the remaining pavement shall also be removed and <br /> replaced. (SEE EXHIBIT 1: LONGITUDINAL CUTTING OF COUNTY <br /> ROADWAYS.) <br /> SASUSANIPROCEDURES%3910DRAFT NOCHANGES 9-12-12.DOC PAGE 1 OF 3 REVISED 09-12-12 <br /> REVISION NO. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.