Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPERVBFON: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORD: No work wfthin the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the wont canoe accomplished under the provisions of the permit. <br /> 3. CIIFAN PAVENJ)ENT: :Dirt and mud shall not be deposited on the pavement <br /> outside the area of wodq and if inadvertently tracked onto the road travel way shall . <br /> be removed'Immediately. <br /> 4. DAiL Y:RESTQRATION:• -PriVate driveways and road intersections shalt be restored <br /> daily <br /> S• WEATBER='IMEIT CONMION: Ail trenches shall be fif fed and'compacted, <br /> ditches an othdr drainage facilities regraded and opened, and the entire work area <br /> restored to weafher-tight condition prior to any rain. <br /> y <br /> t <br /> • t <br />