1 ,
<br /> GENERAL PROVISIONS_
<br /> 1<TL'D 1.iT1.7!'v 7).rev?`^T i A T7(IT.T!l L'C+77D c<r T7�T.t fir• �mr mr�c� A xrr�r,r;�rr 7�.TC C�TiTTT�7Tl.7!"Y1771.TT'V D!l A fl-.D T(:LPi'C`�(1Li_TT,7 A V
<br /> J y1 5,,TLyli ll`IJi T.111Viy V JVIJJ V1tt'L1L.L:ST1LUL1 Urc�J 1'iLatlJ rJSP�LL1yl.iJ YY1111J1y <.VVL\1 1 tIOAJ R rnl
<br /> 'U-BLIC CONVENIENCE AND SAFETY:
<br /> A. Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any ----- "
<br /> prolonged period of time, the Permittee shall notify rhe known users of the respective thoroughfar(s)involved,and shall provide access for vehicular and
<br /> p edestrian traffic to and from the road
<br /> 1 Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane of the existiaa County road traveled way will be
<br /> maintained open to public traffic during working hours in a smooth and safe riding coadition(s).Two lanes shall be open after working hours.
<br /> 2. In cases inhere road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify-tire following
<br /> persons and/or agencies of the time,the period of closure,and the detour route at least twenty-four(24)hours prior to said road closure.
<br /> a.The County of Saa Joaquin Public Works Department d-The local fire district
<br /> b.The County of San Joaquin Sheriff s Office e.The local school district
<br /> C.The local postal service . - f.The local residents involved
<br /> B. Should hazardous conditions relative to the instalMoa operations warrant flagmen,as many capable flagmen as may be necessary shall be provided
<br /> Dy the Permittee and stationed in advance of work to warn and direct traffic.
<br /> a Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and couvtmeace of the public,with
<br /> ?articu.lu attention to be taken in this regard after dark
<br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be
<br /> -e=ved from the job site daily.
<br /> STRUCTURES:
<br /> 4: Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed.in such a way as to create a
<br /> azard or maintenance problem at any time."Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall
<br /> oaform to the following American Association of State Highway.and Transportation Officials(2L SHTO)designations.
<br /> 1.For concrete pipe up to and including thirty-three inches(33`')inside diameter,extra strength concrete pipe conforming to AASHTO Designation M I70M.
<br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concret;pipe conforming to AASHTO designation M 170M Class III.
<br /> 3:Plastic pipe conforming to AASHTO Designation M 294.
<br /> All concrete pipe joints within County road rights-of-way shall be sealed against leakage anchor infiltration with rubber gasket in conformance with
<br /> ecdon65-I'.06 of the California Standard Specifications,or with other methods as may'permitted under the Special Provisions.
<br /> Cast-in-place concrete pipe, vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shallf not be installed within the County road
<br /> .ghts-ofway ualess.specifrcally so stated in the Special Provisions,and only under the conditions as provided.
<br /> D. All structures to be buried within the County road rights-of-way shall be set at such eleva:ors as to allow minimum coverage of thirty inches(30'�to
<br /> it ceaterline of the roadways and twelve inches(I2")at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established
<br /> elow a flat plane extending across the rights-of--way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves.etc.not
<br /> icluded.Future surfaceelevations shall be.aaticipated.as nearly as possible and structure elevations shall be established.•forfutzreidjustrae raccoi Jingly_
<br /> The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvanizedcconr4gated metaI pipe that is to
<br /> ie iuustalled
<br /> All longitudinal atilit.),facilities are to be established(and dimensioned on sketches)from surveyedcenterline'of road right-of-way,not from right-of-way
<br /> iorder)fines.
<br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY-
<br /> All excavations shall be backfilled and compacted immediately after work therein has been completed-
<br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 2D0 feet to the rear thereof,unless otherwise permitted
<br /> Y the Engineer.
<br /> Unless otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in such a manner that the relative
<br /> impaction throughout the entre fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench Detail-
<br /> Backfull material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot
<br /> here 90%compaction is required,and two feet where 80%Compaction is required.
<br /> No portion of the excavation(s)shall be compacted by ponding or jetting unless a maintenance,bond is provided.
<br /> Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a high-frequency
<br /> iternal.vibrator,the compactor to be a size and type approved by the Engineer..Points of compaction shall be not greater than 18"centers and to the full
<br /> epth of the lift
<br /> r. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,mad signs,trees,shrubbery,and/or other permanent road facilities
<br /> apaired by or as a result of construction operations at the construction site(s),or at other gronnd(s)occupied by matt-dais and/or equipment,shall be
<br /> stored-immeaately upon backfilliag of the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior
<br /> construction.
<br /> L All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of constructioa operations,shall be replaced within
<br /> NE WEEK following the backfilling of excavation,weather permitting,with compacted layers.of surfacing materials at least as duck as the existing,and no
<br /> ss than two inches(2")of asphalt concrete over six iuch:s(6")of aggregate base,both as.spedfied below.
<br /> I.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum
<br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bituminous binder to be mixed with
<br /> mineral aggregate shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt
<br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the Califiornia Standard Specifications.
<br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")maximum size aggregate
<br /> Class 2 Aggregate Base specified-in Section 26 of the California Standard Specifications
<br /> Before acceptance of repairs to the County road rights-of-way,ail unsightly and detrimental dirt dust and/or debris shall be removed and the
<br /> instruction areas left in a neat and presentable conditioa(s).
<br /> 1.If necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust
<br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer._
<br /> Upoa request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired in mr-fiiamly by and at the sole expense of,
<br /> re Permittee for a period of one year following acceptance of the work
<br /> 1
<br /> ,
<br />
|