Laserfiche WebLink
GENERAL PROVISIONS- <br /> 'TN 7L'Ii l.m.rn r,.rc+T A r r n 7*Tnt.r nc aero Cir Tel Tl�-n-r a arra'nlTlT.r rI.TL'C�>Z TTTr_rTT.r T'tnrTAT'rV Dfl A rl.-D 7l:iI'f'C?lR_TT.7 n v <br /> J Y EI)U 11iQ DrEl A •�•A 1110IN Vl' J lJ1 STUIR t1CIE STRUCTURES ANT rl.rtrt/;ES TY 11 UN COT, \1 t ROAD ice+.�-1-ITS r c1L <br /> 'UBLIC CONVENIENCE AND SAFETY: <br /> A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any — --- <br /> prolonged period of time,the Permittee shall notify the known users of the respective thoroughfare(s)involved,and shall provide access for vehicular and <br /> p ecieshian traffic to and from the road <br /> 1 Unless otherwise permimed,all work shall be conducted in such a manner that no less ffian one lane Of the existing County road traveled way will be <br /> maintained open to public traffic during working hours in a smooth and safe riding condition(s).Two lanes shall be open after working hours. <br /> 2. In cases where road closure is permitted,the permission to close fire road will be granted under the condition that the Permittee notify-the following <br /> persons and/or agencies of the time,the period of closure,and the detour route at least twenty-four(24)hours prior to said road closure. <br /> a.The County of San Joaquin Public Works Department d.The local-are district <br /> b.The.County of San Joaquin Sheriff s Office e.The local school district <br /> c.The local postai service - f.The local residents involved <br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable f zgmea as may be necessary shall be.provided <br /> ;y the Permittee and stationed in advance of work to warn and direct traffic. <br /> 2. Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate waraing and convenience of the public,with <br /> Dardcukr attention to be taken in this regard after dark <br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,ancoatrollible by lights,signs and barricades,shall be <br /> -emoved from the job site daily. <br /> STRUCTURES: <br /> 4, Walls of structures shall be such quality and strength that they will resist all pressures and mill not crack or be&formed_in such away as to create a <br /> .a=d or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall <br /> oaform to-ire following American Association of State Highway and Transportation Officials(AASHTO)designations. <br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diameter,extra strength concrete pipe conforming to AASHTO Designation M 170NC <br /> 2.Por concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO designation M 170M Class ITL <br /> 3:Plastic pipe conforming to AASHTO Designation M 294. <br /> -,411 concrete pipe joints within County road rights-of-way shall be sealed against leakage and/or infiltration with rubber gasket in conformance with <br /> tctioa�65-1.06 of the California Standard Specifications,or with other methods as may permittee:under the Special Provisions. <br /> `_ Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated alum num alloy pipe shall not be installed within the County road <br /> ghts-of-way unless.specifically so stated in the Special Provisions,and only under the conditions as provided. <br /> J. All structures to be buried within the County road rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches(30")to <br /> 1e centeriine of the roadways and tweLve inches(12")at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established <br /> elow a flat plant exteading across the rights-of-way,no part of which sball extend above the elevations stated above;manholes,lamphoies,valves.etc.not <br /> icluded Future surface-elevations shall be.anticipated.as nearly as possible and structure elevaticns shall be established.for fuTnre,ad ustpeat accordingly. <br /> `Fre County hereby reserves the right W specify in the Special Provisions the gage and.surfax ft.atmmi of any galvanized'coraigated metal pipe that is to <br /> re installed <br /> All longitudinal utility facilities are to be established-(and drrnerisione d on sketches)from surveyed ceattrline'of road right-of-way,not tight of--way <br /> iorder)fmcs- <br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY: <br /> All excavations shall be backfilitd and compacted immediately after work therein has been completed. <br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted <br /> Y the Engineer. <br /> Unlcss otherwise permitted under the Special Provisions,backfill shall bt placed and mechanically compacted in such a manner that the relative <br /> impaction throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench DetaiL <br /> . Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot <br /> here 90%compaction is required,and two feet where 80%compaction is required. . <br /> No portion of the excavation(s)shall be compacted by ponding or jetting unless a maintenance bond is provided. <br /> Crravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a bigh-frequtacy <br /> itematvibrator,the compactor to be a size and type approved by the Eagineer..Points of compaction shall be not greater than 18"centers and to the fall <br /> epth of tht lift <br /> i. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head w—Zis,road signs,trees,shrubbeery,and/or other permanent road facilities <br /> apaired by or as a result of construction operations at the constructiou site(-s),or at other grounds)occupied by materials and/or equipment,shall be <br /> stored immediately upon backfilling of the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior <br /> construction. <br /> L A11 surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within <br /> NE WEEK following the,backfilling of excavation,weather permitting,with compacted layers_of surfacing materials at least as thick as the existing and no <br /> ss than two inches(2")of asphalt concrete over six inches(6")of aggregate base,both as.specified below. <br /> 1.Asphalt Concrete:-Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(I/2")maximum <br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bitrrminoru birder to be mined with <br /> mineral aggregate shall be paving asphalt having(Grade,PG 64-10),unless otherwise,directed by the Engineer.Placement of asphalt <br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for threw-quarter inch(3/4")maximum size aggregate <br /> Class 2 Aggregate Base spccified_ia Section 26 of the California Standard Specifications <br /> Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental(tilt,dust and/or debris shall be removed and the <br /> mstruction areas left in a neat and presentable coaditioa(s). <br /> 1.If necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust <br /> 2.Driveway approaches and field enttaace pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer._ <br /> Upon request by tat County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense of.,, <br /> re-Permittee for a period of one year following acceptance of the work. <br /> t <br /> i\ <br />