Laserfiche WebLink
-P R O VFS_I O N S- - --- - -- --- - - — <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> d-atermined the work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside th'e area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DA.ILY:RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER-TIGHTTCONDITION: Ail trenches shall be filled and'Compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any. rain. <br /> 1 <br />