Laserfiche WebLink
Winter Weather Unity Work <br /> 1. SUPERVISEON: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVLMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY.-RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER.;iTIGHT'CONDITION: A1) trenches shall be fiffed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />