Laserfiche WebLink
GENERAL PROVISIONS_ <br /> 1'C=5 I.TT —a,,7S l�A T r A TTIITT Q S TD cur TRF A CTr mr+T T�mT rn A i.rn Tl7x -T T-K=C'CTTT rTTI.T/ of 7'Kr'rC7 D n A M--D T('_LI'f`C Tali CxT AV <br /> J �'iiutti`(L.T llVJl^�- .ZLtV1v VL'ilU1)J Utlt'P'aLI'.,JZLC LJ lir vr';.ct� 1-S.lYL rlrfiLllVJ_.J YY L I LLLtY 1JVy1Y1 L z�vrav RjC- -iv-CIF-,Y C1L <br /> 'UBLIC CONVENIENCE AND SAFETY: <br /> A Before obstructing any private driveway entrance or County mad traveled way with a trench,spoil bank,equipment or other barrier permitted for any —-- <br /> prolonged period of time, the.Permittee shall notify the known users of the respective thorouglifare(s)involved,and shall provide access for vehicular and <br /> pedestrian traffic to and from the road <br /> I Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane of the existing County road traveled way will be <br /> maintained open to public traffic during working hours in a smooth and safe riding condrtion(s).Two lanes shall be open aft,--r working hours. ' <br /> 2. Ea cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify-the following <br /> persons and/or agencies of the time,the period of closure,and the detour route at least twenty-four(24)hours prior to said mad closure. <br /> a.The County of San Joaquin Public Works Departncnt d.The Iocalfire district <br /> b.The County of San Joaquin Sheriff s Office. e.The local school district <br /> C.The local postal service . - f.The local residents involved <br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable rT�n as may be necessary shall be provided <br /> Dy tie Permittee and stationed in advance of work to wan and direct traffic. <br /> a Lights,signs and barricades shall be furnished,erected and maintainea by the Permittee for the adequate warning and convenience of the public,with <br /> Dar-ticular atteadoa to be taken in this regard after dark. <br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,ancoatrollable by fights,signs and barricades,shall be <br /> �etubve-d from the job site dairy. <br /> STRUCTURES: - <br /> 4 Walls of structures shall be such quality and str-eagdr that they will resist all pressures and will not crack or be deformed.in such a way'as to create a. <br /> -a-=.d or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall <br /> onform to'Che following American Association of State Highway and Transportation Officials(AASHTO)designations. <br /> 1.For concrete pipe up to and including dllir•ty three inches(33")inside diameter,extra strength concrete pipe conforming to-AASHTO-Designation M 1701vL <br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AAS=designation M 170M Class IIL <br /> 3:Plastic pipe conforming to AASHTO Designation M 294. <br /> Ail concrete pipe j oints within County mad rights of--way shall be sealed noainst leakage and/or infiltration with rub' gasket in conformance with <br /> xtionr66-1:06 of the California Standard Specifications,or with oilier methods as may'permitted under the Special Provisions. <br /> Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or coa-ugnted aluminum alloy pip'shall not be installed within the County road <br /> gilts-of nnlrss.specifically so stated in the Special Provisions,and only under the conditions as provided- <br /> D. <br /> rovided3. All structures to be buried within fie County road rights-of-way shall be set at such elevations as to allow Tninimurn coverage of thirty inches(30'q to <br /> it centerline of the roadways and twelve inches(12")jat the bottoms of borrow ditches each side of the roadways.The depths of stmctures shall be established <br /> Blow a fiat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholm,valves.etc.not <br /> icluded Future surface elevations shall be.anticipated.as nearly as possible and structure elevations shall be established.forfutnreadjtzstratat accafdingly. <br /> The County hereby reserves the right to specify in the Special Provisions the gage aud.surface treatment of any galvanized couru.rated metal pipe that is to <br /> �e installed - . <br /> F. AT longitudinal utility facilities are to be established(and dimensioned on sketches)from surveyed-centerline of road-righf-of--way,not from fight-of-wap <br /> corder)lines' <br /> REPA ERS OF THE COUNTY RIOiIT-OF-WAY: <br /> All excavations shall be backfilled and compacted immediately af}ra work therein has been completed- <br /> Trenches <br /> ompletedTrenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted <br /> Y the Engineer. <br /> Unless otherwise permSpecial Provisions,under.the SpecProvisions,backfill shall be placed and mechanically compacted in such a manner that the relative <br /> impaction throughout the entire fill within the County road rift-of-way shall conform to the percentages of compaction as shown on the Trench Detail- <br /> . Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot <br /> here 90%compaction is required,and two feet where 80%compaction is required . <br /> No portion of the excavation(s)shall be compacted by ponding or-jetting unless a maintenance bond is provided <br /> Gravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be,compacted by means of a high-frequency <br /> iternal_vibrator,flue compactor to be a size and type approved by the Engineer..Points of compaction shall be not greater than 18"centers and to the full <br /> epth of the lift. <br /> L All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,mad signs,trees,shrubbery,and/or other permanent road facilities <br /> apaired by or as a result of construction operations at the construction site(s),or at otter ground(s)occupied by materials and/or equipment,shall be <br /> stored-Immediately upon backfilling of tine excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior <br /> construction. <br /> L All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within <br /> NE WEEK following the backfilling of excavation,weather permitting,with compacted layers.of surfacing materials at least as thick as the tx slog and no <br /> ss than.two inches(2")of asphalt concrete over six iaches(6")of aggr noate base,both as.specified below_ <br /> i.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum <br /> ag,--Tegate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bituminous binder to be mixed with <br /> mineral aggr noata shall be paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt <br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications. <br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3i4")maximum size aggregate <br /> Cass 2 Aggregate Base specifiedin Section 26 of the Califaraia Standard Specifications <br /> Before acceptance of repairs to the County mad rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the <br /> =I tracdoa areas left in a neat and presentable condition(s). <br /> L If necessary,County road traveled way and drivewaypavemmIs shall be washed with water to remove dirt and dust <br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be,repaired as directed by the aginear.- <br /> Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense Of, <br /> it'Permittee.for a period of one year following a c,=-pta n ce of the worms <br />