Laserfiche WebLink
EXHIBIT <br /> 9. If the dista�tice between crosemcuts are fess Cheri 950' the entire area � . <br /> between cross—cuts shat be planed and resurf=aced with cne (9) inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to C6un1Ly starudard <br /> Drawing No.' R-29. <br /> 3. • Resurfacing for Bell Boles shall meet these requirements. If excavation occurs <br /> within the shoulder or lane, only that area shc2lf be resurfaced as shown. <br /> 4. ff cross—cutting is performed ars Local Roads at intervals fess then 950, a <br /> Seal Coat for that Bali of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3990.5 (8-2). <br /> Ui r <br /> � O <br /> Paved Shoulder—a�I C- j o¢ <br /> U I+-- <br /> 14 <br /> +- <br /> L O . <br /> LU ! I a U <br /> -A <br /> Z a I <br /> mJ a- <br /> L.J <br /> o <br /> CD <br /> U <br /> I y ED <br /> co <br /> � o <br /> Appby: <br /> l CROSS CUTTING OF <br /> Icou�� ROADWAYS <br /> LX <br /> = CO UW1 1 F LrVk <br /> �1 JE'ar '` D A iii oFPIIB�TC WO__ t <br />