Laserfiche WebLink
NOTES, EXHIBIT 2 <br /> 1. ff the distance between cross—cuts .are lessthen 95T the 'entire area <br /> between cross—cuts shall be planed and resurfaced WM cne (g) inch of <br /> Mphalt Concrete. <br /> I The resurfacing requirements shall .be in addition to COuntY Standard <br /> Drawing No R-29, <br /> I . Resurfacing for Bell boles shall meet these requirements, if excavation occur3 <br /> within the shoulder or lane, only that area shall be resurfaced as shown. <br /> 4. If 0=s—cutting is performed on Local Roads at integrals less then 150' a <br /> Seal Coat for that half of the roadway containing the trench can be used in <br /> lieu of resurfacing. Section 3990.3 (8-2). <br /> r <br /> n(D <br /> U�U <br /> DFS � • <br /> J } D <br /> Paved Shoulder i c3ri X T U) <br /> [' U U <br /> 13 o <br /> a� <br /> E: <br /> O <br /> CD <br /> • � � I 1 <br /> O I <br /> ml I I <br /> J ! D <br /> o <br /> 0 4 � <br /> U <br /> ED <br /> LL L <br /> � o <br /> 0P <br /> 40 Ulm <br /> Cut-TING <br /> COUNTY ROADWAYS <br /> UEAarCOUNTY OF SAN -TOAQ <br /> � � <br /> RO <br /> �� of <br />